47-25 34th Street, Queens
Industrial · built c. 1924 · Block 250, Lot 1.
Building permits
- Alteration, filed Nov 17, 2026, estimated cost $175K, described as “Radon mitigation system. No change in use or egress.”
- Alteration, filed Mar 27, 2026, estimated cost $150K, described as “Filing sp/sd for work associated with removal of existing multi-user restrooms and construction of new multi-user restrooms, additional accessible entrances, and building service rooms. No change to building use or occupancy under this…”
- Alteration, filed Mar 27, 2026, estimated cost $12.0M, described as “Construction of offices, locker rooms, single-user restrooms, and tenant equipment rooms.amend occupancy and use group on first floor to office (b, vii). No change to building bulk.”
- Alteration, filed Mar 27, 2026, estimated cost $1.5M, described as “Filing ms for work associated with removal of existing multi-user restrooms and construction of new multi-user restrooms, additional accessible entrances, and building service rooms. No change to building use or occupancy under this…”
- Alteration, filed Mar 27, 2026, estimated cost $6.0M, described as “Filing gc for removal of existing multi-user restrooms and construction of new multi-user restrooms, additional accessible entrances, and building service rooms. No change to building use or occupancy under this application.”
- Alteration, filed Mar 27, 2026, estimated cost $1.0M, described as “Filing pl for work associated with removal of existing multi-user restrooms and construction of new multi-user restrooms, additional accessible entrances, and building service rooms. No change to building use or occupancy under this…”
- Alteration, filed Mar 27, 2026, estimated cost $150K, described as “Filing st for new structural ramps, infill of area way, new partial cmu walls to define new spaces”
- Alteration, filed Dec 11, 2025, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the NYC building code.live load 300PSF.”
- Alteration, filed Jun 10, 2025, estimated cost $588K, described as “Hereby filing modification to existing mechanical system. New ductwork, new air intake fans, new air plenum, new louver, new welded steel breeching, provide new steel liner work on existing chimney. No change to use, egress or occupancy.”
- Alteration, filed Jun 10, 2025, estimated cost $588K, described as “Hereby filing boiler replacement per plan filed herewith”
- Alteration, filed Jun 10, 2025, estimated cost $25K, described as “Filing plumbing piping for boiler replacement”
- Alteration, filed May 12, 2025, estimated cost $128K, described as “Installation of new concrete pads for mechanical equipment. Framing at existing floors for new duct penetrations”
- Alteration, filed May 12, 2025, estimated cost $242K, described as “Installation of interior non load bearing partitions and hung ceilings. No change to building use, egress or occupancy.”
- Alteration, filed May 9, 2025, estimated cost $200K, described as “Hereby filing mechanical work per plan filed herewith”
- Alteration, filed May 9, 2025, estimated cost $15K, described as “Hereby filing modification to exisiting sprinkler system per plan filed herewith”
- Alteration, filed May 9, 2025, estimated cost $25K, described as “Hereby filing plumbing work and associated piping per plans filed herewith”
- Alteration, filed Aug 17, 2023, estimated cost $50K, described as “Filing new interior partition wall & new door frame, support for the new slab opening/penetrations, repair existing concrete column/slab/beams & dunnage to support new rooftop as shown on drawings submitted herewith. No change in use…”
- Alteration, filed Aug 15, 2023, estimated cost $770K, described as “Remove and install Interior non-load bearing partitions, hung ceilings and millwork. No change to use or occupancy. No change to Building Envelope.”
- Alteration, filed Aug 10, 2023, estimated cost $112K, described as “Modifications to existing plumbing fixture and modifications to existing sprinkler system as shown on plans submitted herewith.”
- Alteration, filed Aug 10, 2023, estimated cost $83K, described as “Modification to ductork distribution and new exhaust system as shown on plans submitted herewith. No change in use. Egress or occupancy.”
- Alteration, filed Feb 21, 2023, estimated cost $48K, described as “New Dish antenna site. Install 3 new sectors, install 6 RRH units, install 1 cabinet in equipment existing equipment room on roof, install 1 GPS antenna. Conduits running from ground floor, to 2nd floor to 4th floor. Remove 1 cabinet.”
- Alteration, filed Nov 10, 2022, estimated cost $400K, described as “Remove and install interior non load bearing partitions, hung ceilings and new cmu wall related to dcas renovation.”
- Alteration, filed Nov 10, 2022, estimated cost $324K, described as “Installation new HVAC unit, louvers, replace exist. Exhaust fan on roof with new, relocate unit heater related to dcas renovation.”
- Alteration, filed Nov 10, 2022, estimated cost $38K, described as “Install new footings, new cmu wall and framing at part of 1ST floor ceiling and 2ND floor related to dcas renovation.”
- Alteration, filed Nov 10, 2022, estimated cost $34K, described as “Remove and install plumbing fixtures and related piping in related to dcas renovation.”
12 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $14,321,250
- 2026–27 tax
- $1,125,380
- Market value (city estimate)
- $31,825,000
- Taxable value
- $10,374,075
- Assessed land
- $3,780,000
- Assessed improvements
- $10,541,250
Tax breaks
- ICAP/ICIP exemption, through Jun 30, 2031, about $280,912 a year below the full tax.
Zoning
M1-4: floor area ratio 2.69 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 12, 2016: $89,000,000
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- 47-25 34th Street Site Selection and Acquisition (City Planning 2020Q0275): Completed, filed Jun 9, 2023, decided Apr 29, 2024. A site selection and acquisition to lease approximately 175,000 sf for approximately 339 DOT personnel, is being sought by the NYC Department of Transportation at 47-25 34th Street in Long Island City, Community District 2, Queens.
- 47-25 34TH STREET, LIC (City Planning P2002Q0400): Completed. 02BOE001Q: BOE PROPOSES TO OBTAIN A LONG TERM LEASE AT 47-25 34TH STREE T, LONG ISLAND CITY, NY IN QUEENS FOR USE AS A AGENCY FACILI TY FOR THE BOARD OF ELECTIONS
- QUEENS BD OF ELECTIONS WAREHSE/OFF (City Planning P2002Q0241): Completed, decided Feb 18, 2003. SITE SELETION & ACQ OF THE 1ST & 2ND FLOOR FOR USE AS ITS*NEW COMBINED WAREHOUSE & OFFICE FACILITY TO REPLACE TWO*BD OF ELECTIONS QUEENS LOCATIONS