33-02 48th Avenue, Queens
Industrial · built c. 1926 · Block 255, Lot 23.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Mar 10, 2025, estimated cost $350K, described as “General construction as shown on the plans.”
- Alteration, filed Oct 2, 2024, estimated cost $1K, described as “Installation of temporary sidewalk shed as per plan. No change in use, egress or occupancy. Sidewalk shed on sidewalk in front of building on 34TH street.”
- Alteration, filed Nov 22, 2023, estimated cost $95K, described as “Modifications to existing Mechanical Systems as per plans filed herewith. No changes in use, egress or occupancy.”
- Alteration, filed Nov 1, 2023, estimated cost $85K, described as “Removal and installation of tenant walls including related finishes and renovations to the existing bathrooms. No change in use, egress or occupancy.”
- Alteration, filed Mar 31, 2023, estimated cost $15K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Sep 8, 2022, estimated cost $5K, described as “Installation of chute debris tied to the pipe scaffolding as per plans.chute debris shall comply with chapter #33 of the 2014 code. No change inuse, egress or occupancy under this application.”
- Alteration, filed Sep 8, 2022, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. Sidewalk shed shall comply with chapter #33 of the 2014 code. No change inuse, egress or occupancy under this application.”
- Alteration, filed Mar 7, 2022, estimated cost $1K, described as “Installation of temporary debris chute as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 5, 2022, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Oct 22, 2021, described as “Installation of heavy duty sidewalk shed. No change in use, occupancy or egress. Work shall comply with chapter 33 of nycc”
Building history
- Alteration, filed May 15, 2013, permit issued - entire job/work, described as “Filing for change of use at 1ST floor and 3RD floor to storage. Interior work filed for partitions.”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $10,615,500
- Market value (city estimate)
- $23,590,000
- Taxable value
- $0
- Assessed land
- $1,620,000
- Assessed improvements
- $8,995,500
Tax breaks
- IDA PILOT, with no end date.
Zoning
M2-1: floor area ratio 2.01 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.