31-28 Thomson Avenue, Queens
College · built 1949 · Block 279, Lot 1.
Building permits
- Alteration, filed Jun 11, 2026, estimated cost $7.4M, described as “Proposed Interior Renovation of the Natural Sciences Lab on the Third Floor, located in Building E.”
- Alteration, filed Apr 15, 2026, estimated cost $30K, described as “The installation of conduit and control wiring through existing walls to connect to existing Con Ed meters "E", LaGuardia Community College. Will involve firestopping of penetrations. No change of use, egress or occupancy.”
- Alteration, filed Mar 31, 2026, estimated cost $175K, described as “Removal of glass block windows, replace with storefront glazing and door.”
- Alteration, filed Aug 11, 2025, estimated cost $11.0M, described as “Proposed interior renovation to laguardia community college library, "e" bldg. No change in use, egress or occupancy.”
- Alteration, filed Mar 19, 2025, estimated cost $7.5M, described as “LGA CC, E Bldg Roof replacement: Removal & replacement existing roofing system, flashings, etc. Install new wearing surfaces on rooftop. Repair of spalled/deteriorated reinforcement of the roof deck & beams. Replace/refurbish existing roof…”
- Alteration, filed Dec 18, 2024, estimated cost $2.0M, described as “Herewith filing for like-to-like replacement of existing damper and/or actuator assembly on the 3RD, 4TH and roof as per plans. No change in use, egress, or occupancy”
- Alteration, filed Nov 20, 2020, estimated cost $5K, described as “Installation of new sidewalk shed at 31-28 thomson avenue, queens as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Nov 19, 2020, estimated cost $5K, described as “Installation of pipe scaffold at 31-28 thomson avenue, queens as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 17, 2018, estimated cost $15K, described as “Installation of pipe scaffold at 31-28 thomson avenue as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 16, 2018, estimated cost $10K, described as “Installation of new sidewalk shed at 31-28 thomson avenue as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
Property taxes
- Assessment
- $34,356,150
- Market value (city estimate)
- $76,347,000
- Taxable value
- $0
- Assessed land
- $2,430,000
- Assessed improvements
- $31,926,150
Zoning
M1-4: floor area ratio 2.93 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Long Island City BID Expansion (City Planning 2024Q0254): Business Improvement District, Completed, filed Feb 2, 2024. An application from the Small Business Services (SBS) on behalf of the Long Island City Business Improvement District (BID) to modify the existing plan and expand the BID in Community Districts 1 and 2 of Queens.