48-02 30th Place, Queens
Commercial · built c. 1926 · Block 287, Lot 11.
Building permits
- Alteration, filed Oct 5, 2026, estimated cost $11K, described as “Modification to existing Mechanical/HVAC Systems. No change in use, egress or occupancy.”
- Alteration, filed Oct 2, 2026, estimated cost $120K, described as “Filing herewith Alteration-CO to amend Final CO at 2nd floor - scope is specific to dividing 1 suite/tenant of the overall total floor occupancy (5 existing increased to 6 for floor), with partitions and finishes as per plans.”
- Alteration, filed Jan 30, 2026, estimated cost $196K, described as “New Mechanical system installation filed herewith. No change to egress use or egress.”
- Alteration, filed Aug 15, 2025, estimated cost $64K, described as “The scope of work consists of removing interior partitions, ceiling, finishes, and doors as shown on drawings filed herewith. No change to occupancy, use or egress.”
- Alteration, filed Aug 15, 2025, estimated cost $52K, described as “The scope of work consists of removing interior partitions, ceiling, finishes, and doors as shown on drawings filed herewith. No change to occupancy, use or egress.”
- Alteration, filed Feb 21, 2025, estimated cost $61K, described as “Mechanical system upgrades as shown in the drawings filed herewith. No change to egress use or egress.”
- Alteration, filed Feb 21, 2025, estimated cost $45K, described as “Additional of new air terminals and adjustments to existing terminals as shown on the drawings filed herewith. No change to occupancy use or egress.”
- Alteration, filed May 17, 2023, estimated cost $12K, described as “Filing herewith mechanical/hvac modifications inclusive of install of linear diffuser, duct work, etc. as per plans. No change in use, egress, or occupancy under this application.”
- Alteration, filed Sep 27, 2022, estimated cost $159K, described as “Modifications to mechanical/hvac system as per plans filed herewith. No change of use, occupancy or egress.”
- Alteration, filed Sep 21, 2022, estimated cost $32K, described as “Modifications to plumbing and sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.”
- Alteration, filed Aug 23, 2022, estimated cost $327K, described as “Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed May 31, 2022, estimated cost $1.1M, described as “Modifications to plumbing and sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.”
- Alteration, filed May 31, 2022, estimated cost $2.9M, described as “Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy or egress.”
- Alteration, filed May 26, 2022, estimated cost $100K, described as “Installation of CMU wall, brick veneer and infill as per plans filed herewith. . No change of use, occupancy or egress.”
- Alteration, filed May 26, 2022, estimated cost $100K, described as “Removal of overhead door/ramp and installation of CMU wall, windows/frames/sills and brick veneer as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed May 24, 2022, estimated cost $15.0M, described as “Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Jan 25, 2022, estimated cost $1K, described as “Non illuminated non advertising accessory wall sign - alexandria center for life science - lic. No change of use, egress or occupancy.”
- Alteration, filed Oct 6, 2021, estimated cost $28K, described as “Structural modifications as per plans filed herewith. General construction. No change of use, occupancy or egress.”
- Alteration, filed Sep 30, 2021, estimated cost $2.0M, described as “Modifications to mechanical systems as per plans filed herewith. No change of use, occupancy or egress.”
- Alteration, filed Sep 30, 2021, estimated cost $950K, described as “Modifications to plumbing and sprinkler systems as per plans filed herewith. No change of use, occupancy or egress.”
- Alteration, filed Sep 27, 2021, estimated cost $3.0M, described as “Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Aug 23, 2021, estimated cost $1.5M, described as “Removal and installation of new windows as per plans filed herewith. No change in use, occupancy or egress.”
- Alteration, filed Aug 23, 2021, estimated cost $3K, described as “Installation of heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 20, 2021, estimated cost $35K, described as “Installation of plywood fence as per drawings. Plywood fence shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 10, 2021, estimated cost $15K, described as “Structural modifications as per plans filed herewith. No change of use, occupancy, or egress.”
28 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $14,515,650
- 2026–27 tax
- $521,563
- Market value (city estimate)
- $32,257,000
- Taxable value
- $12,469,140
- Assessed land
- $2,016,900
- Assessed improvements
- $12,498,750
Tax breaks
- ICAP abatement, through Jun 30, 2036, a $831,089 credit this tax year.
Zoning
M2-1: floor area ratio 2.84 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.
Recent sales
- Dec 19, 2025: $34,500,000
- Oct 9, 2018: $75,000,000
- Mar 8, 2016: $24,034,708
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Long Island City BID Expansion (City Planning 2024Q0254): Business improvement district, Completed, filed Feb 2, 2024. An application from the Small Business Services (SBS) on behalf of the Long Island City Business Improvement District (BID) to modify the existing plan and expand the BID in Community Districts 1 and 2 of Queens.