# 49-29 30th Place, Queens

Industrial · built 1954 · Block 290, Lot 25.

On Umarelli: https://umarelli.org/nyc/4002900025/49-29-30-place

More construction in Long Island City: https://umarelli.org/nyc/queens/long-island-city.md

Every lot on block 290: https://umarelli.org/nyc/queens/290.md

## Building permits

- Alteration, filed Feb 24, 2026, estimated cost $1K, described as “Erect a non-illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Dec 23, 2024, estimated cost $50K, described as “Replace portions of two roof members. shoring filed separately under app Q08041803”
- Alteration, filed Dec 5, 2022, estimated cost $4K, described as “Installation of temporary shoring per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Aug 9, 2022, estimated cost $4K, described as “Installation of two (2) new propane storage racks for on-site forklift(s).”
- Alteration, filed Jul 5, 2022, estimated cost $1K, described as “Erect non-illuminated accessory cabinet wall sign-C1 on storefront, non-flashing, non-advertising sign, no change in use, egress, or occupancy”
- Alteration, filed Jul 5, 2022, estimated cost $450, described as “Erect non-illuminated accessory cabinet wall sign-b on storefront, non-flashing, non-advertising sign, no change in use, egress, or occupancy”
- Alteration, filed Jul 5, 2022, estimated cost $3K, described as “Erect non-illuminated accessory cabinet wall sign-a on storefront, non-flashing, non-advertising sign, no change in use, egress, or occupancy”
- Alteration, filed Jul 5, 2022, estimated cost $1K, described as “Erect non-illuminated accessory cabinet wall sign-C2 on storefront, non-flashing, non-advertising sign, no change in use, egress, or occupancy”
- Alteration, filed Feb 8, 2022, estimated cost $255K, described as “Modification of existing sprinkler system designed as per pipe schedule. No change in use, egress or occupancy.”

## Property taxes

- Assessment: $6,616,800
- 2026–27 tax: $647,698
- Market value (city estimate): $14,704,000
- Taxable value: $6,082,920
- Assessed land: $2,340,900
- Assessed improvements: $4,275,900

## Tax breaks

- Abatement (city code CERP), through Feb 28, 2027, a $12,177 credit this tax year.

## Zoning

M2-1: floor area ratio 1.31 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
