- New Building — Non-residential, filed Jul 15, 2022, 5 stories, described as “The proposed project is a new industrial use high-rise building located at 28 90 Review Avenue The overall building will be five stories and approximately 158-feet in height.”
- Alteration, filed Oct 16, 2026, estimated cost $97K, described as “Modifications to Sprinkler/Plumbing systems as per plans filed herewith. No change to use , egress or occupancy.”
- Alteration, filed Oct 16, 2026, estimated cost $220K, described as “Modifications to existing Mechanical systems as per plans filed herewith. Addition of 12 supplemental VRF evaporators, 1 airside condensing unit. No change to use, egress or occupancy.”
- Alteration, filed Oct 15, 2026, estimated cost $560K, described as “Interior renovations as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Aug 14, 2026, estimated cost $60K, described as “Installing leveler, drive-in rollup door”
- Alteration, filed Jul 27, 2026, estimated cost $370K, described as “Installation of twelve (12) dock levelers and restraints.”
- Alteration, filed Aug 13, 2025, estimated cost $1K, described as “Installation and use of temporary mini crane filed herein. No change in egress, use, and occupancy.”
- Alteration, filed Jul 7, 2025, estimated cost $30K, described as “Installation of temporary shoring as per plans. Shoring shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 7, 2025, estimated cost $23K, described as “Installation of pipe scaffolding as per plans. Pipe scaffold shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 7, 2025, estimated cost $21K, described as “Installation of temporary working platforms as per plans. Platforms shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jun 19, 2025, estimated cost $2K, described as “Temporary overhead protection as per drawings during NB const, filed sep. Overhead protection shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Apr 21, 2025, estimated cost $1K, described as “Installation and use of temporary mini crane filed herein. No change in egress, use, and occupancy.”
- Alteration, filed Feb 11, 2025, described as “Installtion of 2 point suspended scaffold in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Feb 7, 2025, estimated cost $1K, described as “Installation of pipe scaffolding in accordance with NYC 2022 chapter 33 builiding code. No change in egress, use, or occupancy.”
- Alteration, filed Dec 10, 2024, estimated cost $1K, described as “Installation and use of temporary telehandler as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Nov 22, 2024, described as “Temporary suspended scaffold as per drawings during NB const, filed sep. Suspended scaffold shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Nov 20, 2024, estimated cost $1K, described as “Installation and use of temporary telehandler as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jul 26, 2024, estimated cost $1K, described as “Application for the installation and use of material platform as per plans filed herein. No change in egress, use or occupancy.”
- Alteration, filed Jul 1, 2024, estimated cost $1K, described as “Installation and use of temporary exterior climbing platforms as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jun 21, 2024, estimated cost $1K, described as “Installation and use of temporary side wall bracket filed herein. No change in egress, use, and occupancy.”
- Alteration, filed May 29, 2024, estimated cost $2K, described as “Temporary system scaffold stair tower as per drawings. System scaffold stair tower shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed May 22, 2024, estimated cost $1K, described as “Installation and use of temporary mini crane filed herein. No change in egress, use, and occupancy.”
- Alteration, filed May 3, 2024, estimated cost $1K, described as “Installation and use of temporary supported scaffold as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 20, 2024, estimated cost $1K, described as “Scaffold wall Bridge Bracket installation as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Dec 11, 2023, estimated cost $10K, described as “Temporary hoist run-back structure during new bldg construction, filed separately. Hoist run-back structure shall comply with CH#33 of the NYC building code. No change in use, occupancy or egress under this application. Hoist & elevator…”
10 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $5,969,700
- 2026–27 tax
- $605,016
- Market value (city estimate)
- $13,266,000
- Taxable value
- $5,577,210
- Assessed land
- $5,969,700
Zoning
M3-1: floor area ratio 3.40 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
Recent sales
- Mar 16, 2022: $66,000,000
- Jun 23, 2020: $34,080,750, 12,084 sq ft ($2,820 per sq ft)
- Aug 23, 2016: $24,909,787
Open-market sales since 2016, from the Department of Finance’s sales files.
In the news
JLL Arranges $354M Total Capitalization for Industrial Project at 28-90 Review Avenue in Long Island City, Queens, New York YIMBY, Jul 21, 2023.