30-25 Greenpoint Avenue, Queens
Utility · Block 294, Lot 335.
Building permits
- Alteration, filed Oct 30, 2025, estimated cost $200K, described as “Filing for removal of existing foam tank, and installation of new prefabricated bladder tank. Installation of new foam fire suppression system. No change in egress, use or occupancy.”
Zoning
M3-1: floor area ratio 0.00 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).