29-01 Review Avenue, Queens
Industrial · built 2016 · Block 295, Lot 1.
Building permits
- Alteration, filed Sep 8, 2025, estimated cost $150, described as “Replacement face only existing illuminated non-advertising double-face projecting accessory sign - extraspacestorage. No change of use, egress or occupancy.”
- Alteration, filed Feb 6, 2025, estimated cost $5K, described as “Indirectly illuminated non-advertising accessory sign - in property lines - storage. No change of use, egress or occupancy.”
- Alteration, filed Feb 6, 2025, estimated cost $7K, described as “Indirectly illuminated non-advertising accessory sign - in property lines - space. No change of use, egress or occupancy.”
- Alteration, filed Feb 6, 2025, estimated cost $4K, described as “Indirectly illuminated non-advertising accessory sign - in property lines - extra. No change of use, egress or occupancy.”
- Alteration, filed Feb 6, 2025, estimated cost $5K, described as “Indirectly illuminated non-advertising accessory sign - in property lines - storage. No change of use, egress or occupancy.”
- Alteration, filed Feb 6, 2025, estimated cost $7K, described as “Indirectly illuminated non-advertising accessory sign - in property lines - space. No change of use, egress or occupancy.”
- Alteration, filed Feb 6, 2025, estimated cost $4K, described as “Indirectly illuminated non-advertising accessory sign - in property lines - extra. No change of use, egress or occupancy.”
- Alteration, filed Feb 6, 2025, estimated cost $300, described as “Replacement face only existing illuminated non-advertising double-face projecting accessory sign - extraspacestorage. No change of use, egress or occupancy.”
Building history
- New Building — Non-residential, filed Sep 29, 2014, signed off Nov 9, 2017, 6 stories, described as “Filed to erect a 6-story storage building.”
- New Building — Mid-Rise, filed Dec 28, 2010, plan exam - approved, 16 stories, described as “New building”
- Demolition, filed Dec 20, 2010, signed off Jul 15, 2011, units 10 to 0, stories 1 to 0
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $11,460,150
- 2026–27 Tax
- $256,507
- Market value (city estimate)
- $25,467,000
- Taxable value
- $9,309,780
- Assessed land
- $1,164,600
- Assessed improvements
- $10,295,550
Tax breaks
- ICAP Abatement, through Jun 30, 2042, a $754,442 credit this tax year.
Zoning
M1-3: floor area ratio 5.00 built, 5.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NAVD88).
Board and land use applications
- Variance or Special Permit (Board of Standards and Appeals 120-11-BZ): Variance or Special Permit, Granted, filed Aug 17, 2011, decided Apr 24, 2012. Special Permit (§73-44) to reduce the parking requirement for office use and catering use (parking requirement category B1) in a new commercial building. M1-3 zoning district.