33-02 11th Street, Queens
Industrial · built c. 1930 · Block 315, Lot 1.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Oct 6, 2025, estimated cost $500, described as “Proposed installation of heavy duty sidewalk shed for existing building as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2022 code.”
- Alteration, filed Aug 1, 2025, estimated cost $500, described as “Proposed installation of heavy duty sidewalk shed for existing building as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2022 code.”
- Alteration, filed Aug 18, 2023, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Sep 20, 2022, estimated cost $95K, described as “Facade repair work all facades. No change to use egress of occupancy.”
Property taxes
- Assessment
- $1,809,000
- 2026–27 Tax
- $185,963
- Assessed land
- $1,392,300
- Assessed improvements
- $416,700
Zoning
R7X (part of the lot is R6B): floor area ratio 0.34 built, 5.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 11 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).
Board and land use applications
- Vernon Boulevard - Broadway Special Permit Renewal (City Planning 2027Q0181): In Public Review, filed Oct 9, 2026. A second renewal of a special permit (ZR 11-43) to modify bulk to facilitate the development of a new mixed-use development within a large-scale general development, is being sought by Cipico Construction Inc. at 32-01 Vernon Blvd in…
- Vernon Boulevard - Broadway - SP Renewal (City Planning 2024Q0191): Completed, filed Oct 17, 2023, decided Feb 28, 2025. A renewal of a special permit to modify bulk to facilitate the development of a new mixed-use development within a large-scale general development, is being sought by Cipico Construction Inc. at 32-01 Vernon Blvd in Astoria, Community…
- VERNON BLVD- BROADWAY REZONING (City Planning P2012Q0102): Completed, decided Feb 11, 2021. REZONING FROM R5 TO R6B, R7X/C1-3 TO CONSTRUCT 3 BLDGS THAT WILL DEVELOP HOUSING & COMMERCIAL USES IN THE ENTIRE BLOCK. ZONING TEXT AMENDMENT TO ALLOW INCLUSIONARY HOUSING.