41-10 Vernon Boulevard, Queens
Apartment Building · 1,115 units · built c. 1939 · Block 465, Lot 1.
Building permits
- Alteration, filed Nov 6, 2026, estimated cost $502K, described as “Queensbridge South Bldg 25, Removal/Reconstruct/Repairs of Basement slab on grade concrete, interior non-load-bearing CMU partition walls, mortar joints, door & frame, concrete spalls, Install mid-rail and of helical piles and utility…”
- Alteration, filed Nov 18, 2025, estimated cost $1.8M, described as “Application to be reviewed with the Development HUB. Site yard work with 8' high enclosing fence and gates as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jul 25, 2025, estimated cost $23K, described as “Work includes per the filed plans remove concrete slab at elevator pit, remove/reconstruct cmu partition walls, remove/reconstruct concrete walls below elevator pit, remove/replace doors, install new pile cap, install helical piles..”
- Alteration, filed Jul 25, 2025, estimated cost $23K, described as “Work includes per the filed plans remove concrete slab at elevator pit, remove/reconstruct cmu partition walls, remove/reconstruct concrete walls below elevator pit, remove/replace doors, install new pile cap, install helical piles.”
- Alteration, filed Jul 25, 2025, estimated cost $23K, described as “Work includes per the filed plans remove concrete slab at elevator pit, remove/reconstruct cmu partition walls, remove/reconstruct concrete walls below elevator pit, remove/replace doors, install new on-grade elevator pit slab.”
- Alteration, filed Jul 25, 2025, estimated cost $31K, described as “Work includes per the filed plans remove concrete slab at elevator pit, remove/reconstruct cmu partition walls, remove/reconstruct concrete walls below elevator pit, remove/replace doors, install new pile cap, install helical piles..”
- Alteration, filed Apr 16, 2025, estimated cost $50K, described as “Concrete sidewalk/curb repair outside building 25, concrete floor repair inside building 25 basement (cellar)trash compactor room, replacement of soil around perimeter of building, temporary relocation of fencing.”
- Alteration, filed Mar 7, 2023, estimated cost $1.1M, described as “Repair or replace damaged sections of concrete walkways; remove and replace settled soils around perimeter of building to restore grade levels, repair minor interior slab on grade cracks in basement.”
- No Work, filed Oct 16, 2019, described as “Bernie's Back "2020" election Rally; use part of Queens Bridge park for guest speakers and public to attend. Temporary stage will be filed under Alt II #421476325. Fire guards will consist of trained volunteers, NYCPD, NYCFD, NYCEMT, etc…”
- Alteration, filed Feb 21, 2018, estimated cost $30K, described as “New Antenna Installation. New Sectors of Antennas on the roof. All work is in conformance with TPPN #5/98. No change in use, exits or occupancy.”
- Alteration, filed Feb 20, 2018, estimated cost $57K, described as “New Antenna Installation. Install new exterior telecommunication cabinets, related steel dunnage with enclosure, stairs, and railing on the roof. New antenna sector on the roof. All work is in conformance with TPPN #5/98. No change in use,…”
Property taxes
- Assessment
- $29,529,000
- Market value (city estimate)
- $65,620,000
- Taxable value
- $0
- Assessed land
- $15,097,500
- Assessed improvements
- $14,431,500
Zoning
R6 (part of the lot is M1-4): floor area ratio 1.15 built, 2.43 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone X, moderate risk: a 0.2% chance of flooding each year.
Board and land use applications
- Silvercup West Vesting Text (City Planning P2014Q0128): Completed, decided Aug 8, 2014. Zoning text amendment to allow for additional special permit renewal periods and to modify vesting provisions due to site constraints on Silvercup West site.