# 14-14 29th Avenue, Queens

Public School · built 1950 · Block 537, Lot 14.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/4005370014/14-14-29-avenue

More construction in Astoria: https://umarelli.org/nyc/queens/astoria.md

Every lot on block 537: https://umarelli.org/nyc/queens/537.md

## Building permits

- Alteration, filed Sep 8, 2025, estimated cost $390K, described as “The scope of work includes all labor, materials, and equipment necessary to complete installation of the supplemental cooling system in the cafeteria and main office.”
- Alteration, filed Feb 28, 2025, estimated cost $6.0M, described as “P.S. 171-Q: Existing boiler, oil tanks, and steam systems in cellar removed. New 300-ton heat pump chiller/heater on roof, DOAS units in fan rooms, AHU for auditorium/gym. Backup boilers, new FCUs,DDC controls,dual-temp pumps, and glycol…”
- Alteration, filed Oct 15, 2024, estimated cost $10K, described as “Installation of debris chute for ps 171Q at 14-14 29TH avenue, queens as per indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Sep 18, 2022, estimated cost $30K, described as “Installation of temporary construction fence for ps 171Q at 14-14 29TH avenue, queens as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Sep 14, 2022, estimated cost $30K, described as “Installation of pipe scaffold for ps 171Q at 14-14 29TH avenue, queens as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Sep 14, 2022, estimated cost $30K, described as “Installation of new sidewalk shed for ps 171Q at 14-14 29TH avenue, queens as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Oct 4, 2021, estimated cost $2.1M, described as “Remove parapets down to roof, removal of face brick down to lintel, clean and repair of window lintels, rebuild face brick, and replacement of corner brick.”
- Alteration, filed Apr 21, 2020, estimated cost $70K, described as “Submitted on behalf of contractor for the installation of emergency temporary construction equipment (scaffolding) 13700 sqf, in conjunction with llw # 122382. No change in use, occupancy or egress”
- Alteration, filed Mar 5, 2020, estimated cost $50K, described as “Submitted on behalf of contractor for the installation of emergency temporary construction equipment (shed) 350 lf, no change in use, occupancy or egress”

## Property taxes

- Assessment: $8,167,050
- Market value (city estimate): $18,149,000
- Taxable value: $0
- Assessed land: $1,260,000
- Assessed improvements: $6,907,050

## Zoning

R6B: floor area ratio 1.63 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology