# 30-09 21st Street, Queens

Apartment Building · 10 units · built 2025 · Block 549, Lot 16.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/4005490016/30-09-21-street

More construction in Astoria: https://umarelli.org/nyc/queens/astoria.md

Every lot on block 549: https://umarelli.org/nyc/queens/549.md

## Building permits

- Alteration, filed Sep 2, 2026, estimated cost $8K, described as “Proposed installation of pipe scaffold for new building as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Sep 2, 2026, estimated cost $1K, described as “Proposed installation of heavy duty sidewalk shed for new building as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2022 code.”
- Alteration, filed Oct 14, 2025, estimated cost $8K, described as “Proposed installation of pipe scaffold for new building as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Oct 8, 2025, estimated cost $100K, described as “Install fire sprinkler systems for 6-story with penthouse mixed-use building”
- Alteration, filed Sep 9, 2025, estimated cost $1K, described as “Proposed installation of heavy duty sidewalk shed for new building as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2022 code.”
- Alteration, filed Apr 7, 2025, described as “8.0' High Wood Construction Fence Located within the property lines along the perimeter of the lot.”
- Alteration, filed Jun 7, 2019, estimated cost $3K, described as “Erect construction fence to safe guard property in conjunction NB 421634949. No change to the use, egress, and occupancy.”
- Alteration, filed Apr 13, 2018, estimated cost $5K, described as “Installation of a temporary scaffold as per plans in conjunction with general construction. No change in use, egress or occupancy. Scaffold shall comply with 2014 NYC building code, chapter 33.”
- Alteration, filed Apr 12, 2018, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed approximately 35'LONG as per plans during general construction work. No change in use, egress or occupancy. Sidewalk shed shall comply with 2014 NYC building code, chapter 33.”

## Building history

- New Building — Multi-Family, filed May 17, 2018, permit issued - entire job/work, 10 units, 6 stories, described as “New 6 story + penthouse mixed-use building. Commercial space at first floor with 11 class a dwelling units as per "quality housing" provisions”
- Demolition, filed Sep 5, 2017, signed off Feb 26, 2019, units 2 to 0, stories 3 to 0, described as “Full demolition of three story structure, using hand held equipment, partial mechanical”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $81,000
- 2026–27 Tax: $3,658
- Market value (city estimate): $180,000
- Taxable value: $29,448
- Assessed land: $81,000

## Zoning

R7A: floor area ratio 4.48 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Apr 10, 2025: $1,800,000
- Nov 2, 2022: $1,400,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
