# 25-10 30th Avenue, Queens

Hospital · built 1950 · Block 576, Lot 12.

On Umarelli: https://umarelli.org/nyc/4005760012/25-10-30-avenue

More construction in Astoria: https://umarelli.org/nyc/queens/astoria.md

Every lot on block 576: https://umarelli.org/nyc/queens/576.md

## Building permits

- Alteration, filed Oct 29, 2026, estimated cost $60K, described as “Stairs replacement to HVAC room at roof level as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Sep 8, 2026, estimated cost $70K, described as “Mount sinai - elevator pit repair as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Mar 19, 2026, estimated cost $14.1M, described as “Mount Sinai - Interior renovations required for new Intensive Care Unit including modifications to non load bearing partitions, flooring/ ceiling work, and related construction as per plans filed herewith. No change in use, egress, or…”
- Alteration, filed Mar 18, 2026, estimated cost $67K, described as “Install of a new metal maintenance/service access stair as per plans. Not intended for occupant egress and will not serve as required means of exit. Its purpose is to provide limited access for building personnel and contractors.”
- Alteration, filed Oct 21, 2025, estimated cost $570K, described as “Mount sinai queens - infusion alteration - general construction including modifications to floors, partitions, ceiling and doors as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Jul 29, 2024, estimated cost $186K, described as “Interior renovation of on call suites”
- Alteration, filed Jun 21, 2023, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Feb 22, 2023, estimated cost $275K, described as “Installation of new ac unit on roof”
- Alteration, filed Feb 7, 2023, estimated cost $15K, described as “Structural support for one mh unit (ms filed under appl# Q00815229)”
- Alteration, filed Nov 21, 2022, estimated cost $1K, described as “Installation of 316 lf heavy duty sidewalk shed as per plans. No change in egress, use, or occupancy.”
- Alteration, filed Jul 27, 2022, estimated cost $5K, described as “This application is being filed for two temporary tents to handle the emergency of covid-19 pandemic (coronavirus). The tents will be used for patients' influxes near the emergency department. Temp. Tents will be approximatly 600 sq.…”
- Alteration, filed Jul 19, 2022, estimated cost $90K, described as “Mount Sinai - Modification to existing window to create new opening onto roof of adjacent building as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Jul 18, 2022, estimated cost $150K, described as “Mount sinai medical center - structural modifications related to the HVAC modernizatiom as indicated on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 15, 2022, estimated cost $25K, described as “Installation of temporary scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 13, 2022, estimated cost $250K, described as “Mount sinai medical center - HVAC modernization - plumbing modifications as indicated on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Jul 12, 2022, estimated cost $6.0M, described as “Mount sinai medical center - HVAC modernization project - mechanical modifications as indicated on plans filed herewith. No change in use, egress or occupancy”
- Alteration, filed Jun 15, 2021, estimated cost $30K, described as “Replacement of 3 ton split air conditioning system.”
- Alteration, filed Apr 24, 2021, estimated cost $1K, described as “Installation of temporary 52' high pipe scaffold originating (off shed) as per plan. No change in use egress or occupancy,pipe scaffold shall comply with CHAPTER#33 of 2014 the ny building code.”
- Alteration, filed Apr 24, 2021, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Feb 28, 2020, estimated cost $25K, described as “Msq - infusion center - removal of 48 sprinkler heads and associated branch piping. Installation of 8 temporary sprinkler loop heads. No change in use, egress, or occupancy.”
- Alteration, filed Feb 26, 2020, estimated cost $65K, described as “Msq - infusion center - modifications to existing sprinkler system as indicated on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Feb 26, 2020, estimated cost $350K, described as “Msq - infusion center - plumbing modifications as indicated on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Feb 26, 2020, estimated cost $600K, described as “Msq - infusion center - mechanical modifications as indicated on plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Nov 12, 2019, estimated cost $70K, described as “Mount Sinai - Plumbing Modifications as per plans filed herewith. No change in use, egress, or occupancy.”
- Alteration, filed Nov 11, 2019, estimated cost $24K, described as “Mount Sinai - Sprinkler modifications as per plans filed herewith. No change in use, egress, or occupancy.”

5 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/4005760012/25-10-30-avenue.

## Building history

- Demolition, filed Sep 23, 2013, signed off Nov 18, 2013, stories 4 to 0, described as “Eull demolition of 3 story stucco /wood frame comm building”
- Alteration, filed Jun 10, 2013, permit issued - entire job/work, described as “Herewith filing alt-1 change in egress on the 1ST floor.”
- New Building — Non-residential, filed Feb 4, 2013, permit issued - entire job/work, 6 stories

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $71,967,600
- Market value (city estimate): $159,928,000
- Taxable value: $0
- Assessed land: $1,525,500
- Assessed improvements: $70,442,100

## Tax breaks

- Nonprofit exemption (hospital), with no end date, about $7,807,045 a year below the full tax.

## Zoning

R6: floor area ratio 5.52 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or Special Permit (Board of Standards and Appeals 170-13-BZ): Variance or Special Permit, Granted, filed Jun 6, 2013, decided Sep 10, 2013. Variance (§72-21) to allow the enlargement of Mount Sinai Hospital of Queens contrary to §24-52 (height & setback); §24-11(lot coverage); §24-36 (rear yard); and §§24-382 & 33-283 (rear yard equivalents). R6 & C1-3 zoning districts.
- QNS COMMUNITY HOSP. AMBULANCE (City Planning P1997Q0513): Completed. 97FD0001Q: DEVELOPMENT OF A FIRE DEPT. BUREAU OF EMERGENCY MEDICAL SERV ICE AMBULANCE STTION THE GROUNDS OF WESTERN QUEENS COMMUNITY HOSPITAL IN ASTORIA
- W. QUEENS COMM HOSPITAL AMBULANCE (City Planning P1997Q0470): Completed, decided Dec 26, 1997. SITE SELECTION & ACQ OF A VACANT BASEMENT IN A 2-STORY BLDG\*FOR THE NEW WEST QUEENS COMMUNITY HOSPITAL AMBULANCE STATION

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
