# 28-27 30th Street, Queens

Utility · Block 595, Lot 10.

On Umarelli: https://umarelli.org/nyc/4005950010/28-27-30-street

More construction in Astoria: https://umarelli.org/nyc/queens/astoria.md

Every lot on block 595: https://umarelli.org/nyc/queens/595.md

## Building permits

- Alteration, filed Oct 29, 2026, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Apr 27, 2026, estimated cost $46K, described as “Replacing existing standpipe fire pump with new in the cellar as per plans filed herewith.”
- Alteration, filed Apr 29, 2025, estimated cost $1K, described as “Installation of temporary system scaffold as per plan. No change in use, egress, or occupancy. The system scaffold starts from the ground floor of the front building on 30TH street.”
- Alteration, filed May 31, 2023, estimated cost $1K, described as “Installation of temporary plastic barriers with chain link fence and reflectors on top as indicated on the attached drawings. There are no changes in use, egress or occupancy.”
- Alteration, filed Feb 15, 2023, estimated cost $1K, described as “Installation of sidewalk shed as indicated on the attcahed drawings. There are no changes in use, egreess or occupancy.”
- Alteration, filed Nov 3, 2022, estimated cost $1.5M, described as “Filing for mechanical modifications in a commercial space. No change of use, egress or occupancy.”
- Alteration, filed Nov 3, 2022, estimated cost $402K, described as “Structural modifications in a commercial building as per plans filed. No change in use, egress or occupancy.”
- Alteration, filed Nov 2, 2022, estimated cost $560K, described as “Filing removal and replace of existing generators located within the cellar and roof and cellar switchgear with one new 750KW diesel generator and switchgear on the second floor and new battery room on the first floor and includes new…”
- Alteration, filed Mar 12, 2021, described as “Installation of pipe scaffolding. No change in use, occupancy or egress.”
- Alteration, filed Feb 18, 2021, estimated cost $75K, described as “Miscellaneous general construction, protection, dunnage framing and roof removal related to the ac unit replacement on the 1st floor and Roof.”
- Alteration, filed Jan 27, 2021, estimated cost $460K, described as “Replacement of AC coil inside existing First Floor Air Handling Unit and associated Air-cooled Condesnising Units located on the Roof”
- Alteration, filed Nov 11, 2019, estimated cost $10K, described as “New low pressure gas service with relevant piping for new boiler”
- Alteration, filed Nov 11, 2019, estimated cost $100K, described as “Replace existing boiler as per plans”

## Zoning

C4-4A: floor area ratio 0.00 built, 4.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology