# 35-35 Steinway Street, Queens

Commercial · built c. 1935 · Block 669, Lot 8.

Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.

On Umarelli: https://umarelli.org/nyc/4006690008/35-35-steinway-street

More construction in Long Island City: https://umarelli.org/nyc/queens/long-island-city.md

Every lot on block 669: https://umarelli.org/nyc/queens/669.md

## Building permits

- Alteration, filed Aug 13, 2026, estimated cost $11K, described as “Interior renovation of direct replacement of existing spray booth with new. No change in use, egress or occupancy.”
- Alteration, filed Oct 30, 2025, estimated cost $7K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jul 25, 2025, estimated cost $195K, described as “Removal of damaged existing right front wall (west section), and rebuilding of that section. Relocation of all electrical components on inside of that front wall section to the side (west) wall adjacent to existing electrical component. No…”
- No Work, filed Jul 15, 2020
- Alteration, filed Jul 15, 2020, estimated cost $4K, described as “Plumbing work in conjunction with tenant fit-out.”

## Building history

- Alteration, filed Oct 15, 2019, permit issued - entire job/work, described as “Convert existing vacant commercial space to house of worship. Obtain new c of o.”
- Alteration, filed Mar 28, 2007, signed off Mar 12, 2012, stories 2 to 1, described as “Propose change of use from hardware store u.g. 6 to eating and drinking establishment without restrictions u.g. 12, occupancy group F4.”

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $645,300
- 2026–27 Tax: $64,450
- Market value (city estimate): $1,434,000
- Taxable value: $593,520
- Assessed land: $168,300
- Assessed improvements: $477,000

## Zoning

M1-4/R7A: floor area ratio 1.00 built, 4.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Innovation QNS Rezoning and LSGD (City Planning 2021Q0106): Zoning Map Change, Special Permit, Zoning Text Change, Completed, filed Mar 30, 2022, decided Jul 16, 2026. Kaufman Bedrock Astoria I LLC and Silverstein Astoria Member LLC seek a zoning map amendment from M1-1 and C4-2A to M1-4/R7X, M1-4/R7-3, M1-4/R9, and M1-5/R9-1, zoning text amendments, and Large-Scale General Development special permits…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
