# 30-45 42nd Street, Queens

Public School · built c. 1923 · Block 696, Lot 14.

On Umarelli: https://umarelli.org/nyc/4006960014/30-45-42-street

More construction in Astoria: https://umarelli.org/nyc/queens/astoria.md

Every lot on block 696: https://umarelli.org/nyc/queens/696.md

## Building permits

- Alteration, filed Jul 15, 2026, estimated cost $20K, described as “Fn/PS70Q - for temporary construction equipment(fence) submitting on behalf of contractor, related to DOB # Q01309489 no change in use, occupancy or egress”
- Alteration, filed Jul 15, 2026, estimated cost $20K, described as “Sh/PS70Q - for temporary construction equipment(shed) submitting on behalf of contractor, related to DOB # Q01309489 no change in use, occupancy or egress”
- Alteration, filed Jul 15, 2026, estimated cost $20K, described as “Ch/PS70Q - for temporary construction equipment(chute) submitting on behalf of contractor, related to DOB # Q01309489 no change in use, occupancy or egress”
- Alteration, filed Jul 15, 2026, estimated cost $20K, described as “Sf/PS70Q - for temporary construction equipment(scaffold) submitting on behalf of contractor, related to DOB # Q01309489 no change in use, occupancy or egress”
- Alteration, filed Oct 28, 2025, estimated cost $10.0M, described as “Q070-replace roofs, railing at parapets, & windows includingshade s & guards. Exterior masonry repointing & repairs.”
- Alteration, filed Dec 12, 2022, estimated cost $242K, described as “Renovate existing library in room 408 - remove existing non-structural partitions - modify suspended ceiling - replace existing interior door - no change in use - no change in occupancy - no change in egress - no change in ventilation”
- Alteration, filed Nov 16, 2022, estimated cost $10K, described as “P.s 70 q ,we shall install construction fence at thebuilding, there is no change of use,egress or ocupancy. This application will be filed inconjunction with DOB now Q00664543”
- Alteration, filed Mar 23, 2022, estimated cost $350K, described as “Supplemental cooling system for auditorium to be provided by split system heat pumps. Soffits to be provided to cover piping in stairwell.”
- Alteration, filed Jan 26, 2022, estimated cost $334K, described as “Removal and replacement of flooring, curtains, fixed seating (auditorium) with ADA required locations. Repainting of walls and ceiling, protection of existing wall art/murals.”
- Alteration, filed Jan 19, 2022, estimated cost $40K, described as “Q070 - Architectural work related to Replacement and repair of structural elements.”

## Property taxes

- Assessment: $13,403,700
- Market value (city estimate): $29,786,000
- Taxable value: $0
- Assessed land: $1,264,500
- Assessed improvements: $12,139,200

## Zoning

R5: floor area ratio 2.18 built, above the 1.50 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
