# 4301 Berrian Boulevard, Queens

Utility · Block 776, Lot 150.

On Umarelli: https://umarelli.org/nyc/4007760150/4301-berrian-boulevard

More construction in Astoria: https://umarelli.org/nyc/queens/astoria.md

Every lot on block 776: https://umarelli.org/nyc/queens/776.md

## Building permits

- Alteration, filed Dec 16, 2025, estimated cost $474K, described as “RLCY-BB-02-J22G-F-03- To replace existing door and existing skylights for the Chlorine and Service Building Bowery Bay WWTF.”
- Alteration, filed Jul 28, 2025, estimated cost $638K, described as “RLCY-BB-02-J22G-F-01- To repair and restore electrical conduit, wires, systems and processes necessary for wastewater reclamation at Bowery Bay WWTF.”
- Alteration, filed Mar 6, 2024, estimated cost $1.5M, described as “Demolition of various process mechanical pumps and associated piping, valving, supports, and equipment pads. Installation of various process mechanical pumps and associated piping, valving, supports, and equipment pads.”
- Alteration, filed Jul 13, 2022, estimated cost $700K, described as “Remove and replace with new interior doors, replace floor and wall tiles of bathroom, Kitchen and locker room for STW( ( Sewage Treatment Workers) of Service Building at Bowery Bay , WRRF. Repair of HVAC systems of those rooms. install…”
- Alteration, filed Mar 25, 2022, estimated cost $15K, described as “General Construction - Replacement of windows and door”
- Alteration, filed Mar 16, 2022, estimated cost $20K, described as “Building 10 and 4 - core drilling outside walls to run electrical conduits. Building 4 - door replacement with flood protection doors”
- Alteration, filed Mar 2, 2022, estimated cost $120K, described as “Building 6 - outside masonry demo and restoration for floodwalls and replacement of exterior doors.”
- Alteration, filed Oct 22, 2021, estimated cost $1.1M, described as “Remove and replace with new interior doors, replace floor and wall tiles of bathroom, kitchen and locker room for STW (sewage treatment workers) at dewatering building. Repair of HVAC systems of those rooms.”
- Alteration, filed Oct 19, 2021, estimated cost $800K, described as “Masonry work for exterior of buildings 1,2,3,5 and replacement of exterior doors”
- Alteration, filed Jun 28, 2021, estimated cost $864K, described as “Remove and replace existing sump pumps located a various locations around Bowery Bay WRRF with duplex sump pumps.”
- Alteration, filed Mar 25, 2021, estimated cost $100K, described as “Precast concrete footing piers being installed 4 feet deep to support temporary trailer structure”
- Alteration, filed Jan 6, 2021, estimated cost $220K, described as “Construction Fence to surround the new digester electrical building. This permit was filed through e-Filing as number XXXXXXXXX”
- Alteration, filed Nov 16, 2020, estimated cost $590K, described as “General Structural - Interior renovation,including flood protection walls. Installation of four 2.05' concrete Pads.”
- Alteration, filed May 20, 2020, estimated cost $590K, described as “General Structural - Interior renovation,including flood protection walls. Installation of four 2.05' concrete Pads.”
- Alteration, filed May 11, 2020, estimated cost $220K, described as “General structural- New Building Structural”
- Alteration, filed May 6, 2020, estimated cost $312K, described as “Installation of heating and cooling systems and associated ducts and piping.”
- Alteration, filed Apr 29, 2020, estimated cost $72K, described as “Installation of one duplex sump pump.”
- Alteration, filed Mar 23, 2020, estimated cost $11K, described as “Replace and install HVAC equipment”
- Alteration, filed Mar 23, 2020, estimated cost $11K, described as “Replacement of heating and ventilating equipment; Demolition of HVAC equipment”
- Alteration, filed Mar 19, 2020, estimated cost $11K, described as “Replacement of heating and ventilating equipment; Demolition of HVAC equipment”
- Alteration, filed Mar 19, 2020, estimated cost $12K, described as “Replacement of heating and ventilating equipment.”
- Alteration, filed Mar 18, 2020, estimated cost $22K, described as “Replacement of heating and cooling equipment.”
- Alteration, filed Mar 18, 2020, estimated cost $26K, described as “Replacement of heating and cooling equipment; HVAC demolition”
- Alteration, filed Mar 18, 2020, estimated cost $25K, described as “Replacement of existing HVAC equipment; Demolition of heating and cooling equipment”
- Alteration, filed Mar 18, 2020, estimated cost $300K, described as “Replacement of various air handling units, water unit heaters, and exhaust/supply air fans throughout the Main Building.”

19 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/4007760150/4301-berrian-boulevard.

## Building history

- New Building, filed Aug 11, 2020, plan exam - in process, 1 story, described as “General (ot)- general construction (including piles, foundation”
- New Building, filed Jun 10, 2020, plan exam - in process, 1 story, described as “Structural - new digester electrical building housing various electrical distribution equipment. General construction, including excavation, mini piles installation, foundation, cast in place concrete, masonry,exterior-interior retaining…”
- New Building, filed Jun 10, 2020, plan exam - in process, 1 story, described as “Structural - new digester electrical building housing various electrical distribution equipment. General construction, including excavation, mini piles installation, foundation, cast in place concrete, masonry,exterior-interior retaining…”
- New Building, filed Jun 10, 2020, permit issued - entire job/work, 1 story, described as “General (ot)- general construction (including piles, foundation”
- Demolition, filed Jul 15, 2003, signed off Oct 24, 2003, stories 1 to 0

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Zoning

M3-1: floor area ratio 0.00 built, 2.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.

## Board and land use applications

- BOWERY BAY WATER CONTROL PLANT (City Planning P1999Q0442): Completed. 99DEP163Q: DCP IS PROPOSING TO UPGRADE THE BOWERY BAY WATER POLLUTION C ONTROL PLANT
- BOWERY BAY WATER POLLUTION PLANT (City Planning P1993Q0115): Completed, decided Nov 30, 1996. 95DEP006Q: MAP CHANGE TO LEGALIZE AN EXISTING STREET GRADE ON BERRIAN B OULEVARD BETWEEN 42ND STREET AN DTHE SOUTHEASTERN END OF BER RIAN BLVD
- RIKERS ISLAND NEW WATER MAIN (City Planning P1987Q0388): Completed, decided Sep 15, 1988. SITE SELECTION & ACQUISITION TO CONSTRUCT & MAINTAIN A 24\*INCH WATER MAIN.
- RIKERS ISLAND NEW WATER MAIN (City Planning P1987Q0532): Completed, decided Jun 18, 1987. SITE SELECTION FOR CONSTRUCTION OF A 24 INCH WATER MAIN &\*RESTORE AREA TO ITS ORIGINAL CONDITION. BL776 LOT150. BL814\*LOT27.
- DEP Berrian Blvd Demapping (City Planning 2024Q0443): City Map Change, Filed. NYC DEP is requesting to demap a dead-end portion of Berrian Blvd in Queens (CD 1) to build a new substation and emergency generator for the wastewater treatment plant. Related project (2025Q0325) for zoning map changes and site selection.
- DEP Berrian Blvd Rezoning and Site Selection (City Planning 2025Q0325): Zoning Map Change, Filed. NYC DEP is requesting a zoning map amendment of portions of a street to be demapped along Berrian Blvd from M1-1 to M3-1. The applicant is also seeking a site selection action for the siting of a new wastewater treatment plant in Astoria,…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology