# 23-18 31st Street, Queens

Commercial · built 1999 · Block 842, Lot 77.

On Umarelli: https://umarelli.org/nyc/4008420077/23-18-31-street

More construction in Astoria: https://umarelli.org/nyc/queens/astoria.md

Every lot on block 842: https://umarelli.org/nyc/queens/842.md

## Building permits

- Alteration, filed Dec 22, 2023, estimated cost $12K, described as “Replace existing 3-ton mini-split unit ( condenser and air handler) with new, same location. No change in use, egress or occupancy under this application.”
- Alteration, filed Jun 22, 2023, estimated cost $25K, described as “Install 3-Ductless condensing units on the roof, and 3-air handlers inside retail store in basement, total of 10 tons. No change in use, egress or occupancy under this application.”
- Alteration, filed May 11, 2022, estimated cost $18K, described as “Remove and replace 1-exist air handler from store with 4-air handlers (clng cassettes); remove and replace 1-exist condenser with 2-condensers on roof ; total of both 5-tons. Remove old AC ducts from store. No change in use, egress or…”
- Alteration, filed Apr 25, 2022, estimated cost $10K, described as “Add new steel members for roof openings . No change to use, egress or occupancy”
- Alteration, filed Nov 10, 2021, estimated cost $80K, described as “Proposed work to replace concrete and medal deck on existing ramp.”
- Alteration, filed Nov 5, 2021, estimated cost $640K, described as “Interior office renovation.removal and installation of walls, ceilings, door and floor finishes as shown on plans. No change to use, egress or occupancy.”
- Alteration, filed Oct 28, 2021, estimated cost $110K, described as “Cap and remove existing plumbing fixtures and associated piping. Installation of new plumbing fixtures and related piping as shown on drawings. No change to use, egress or occpancy.”
- Alteration, filed Oct 28, 2021, estimated cost $245K, described as “Remove and install new duct work, ceilng diffusers . New ac units and related duct work as shown on drawings. No change to use, egress or occupancy.”
- Alteration, filed Dec 18, 2020, estimated cost $10K, described as “Plumbing fixtures and equipment for new tenant space.”
- Alteration, filed Dec 18, 2020, estimated cost $125K, described as “Mechanical equipment for new tenant space. Scope includes installation of new split system, condensing units, evaporator units, and related ductwork and exhaust fans.”
- Alteration, filed Jul 13, 2020, estimated cost $40K, described as “Mechanical scope of work in-conjunction with general construction application, for interior renovation of existing commercial space.”
- Alteration, filed Jul 13, 2020, estimated cost $17K, described as “Plumbing scope in-conjunction with general construction renovation.”

## Building history

- Alteration, filed Jul 14, 2003, signed off Aug 31, 2004, described as “New second floor addition. Change occupancy of first floor from offices and ret ail U.G. 6, to Medical Offices,U.G. 4.”
- Demolition, filed Mar 9, 1999, signed off Aug 13, 1999, stories 2 to 0
- Demolition, filed Mar 9, 1999, signed off Aug 13, 1999, stories 1 to 0
- New Building — Non-residential, filed Mar 3, 1999, signed off Jan 21, 2003, 2 stories

New buildings, demolitions and major alterations filed in the city’s older system since 1989.

## Property taxes

- Assessment: $4,404,150
- 2026–27 Tax: $359,186
- Market value (city estimate): $9,787,000
- Taxable value: $3,307,725
- Assessed land: $652,500
- Assessed improvements: $3,751,650

## Tax breaks

- ICAP/ICIP exemption, through Jun 30, 2029, about $32,380 a year below the full tax.

## Zoning

C4-3 (part of the lot is R5D): floor area ratio 1.87 built, 3.40 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
