# 58-01 Queens Boulevard, Queens

Apartment building · 131 units · built 2024 · Block 1334, Lot 1.

On Umarelli: https://umarelli.org/nyc/4013340001/58-01-queens-boulevard

More construction in Woodside: https://umarelli.org/nyc/queens/woodside.md

## Building permits

- New Building — Mid-Rise, filed Sep 22, 2022, estimated cost $19.5M, 131 units, 12 stories, described as “Erecting a residential building as per plans and obtaining OTCR 19-23 Final certification.”
- Alteration, filed May 29, 2025, estimated cost $200K, described as “Filing for supported scaffolding application for exterior work of new building (Q00790556). No change in egress, occupancy and use.”
- Alteration, filed May 13, 2025, estimated cost $154K, described as “This application is filed for a temporary use permit for a sales office pursuant to section AC 28-111 and BB 2010-002. Temporary use permit is for 90 days.”
- Alteration, filed Jan 20, 2025, estimated cost $6K, described as “Installation of overhead protection and roof protection as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Jul 15, 2024, estimated cost $10K, described as “Installation of single personnel/material hoist in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Apr 9, 2024, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Apr 24, 2023, estimated cost $20K, described as “This application is for temporary standpipe application in conjunction with NB”
- Alteration, filed Apr 18, 2023, estimated cost $30K, described as “Installation of new concrete curb cut for an application that is in conjunction with a new residential building.”
- Alteration, filed Apr 12, 2023, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed as per plans in conjunction with NB construction. No change in use, egress or occupancy. Sidewalk shed to comply with chapter 33 of NYC building code.”
- Alteration, filed Apr 12, 2023, estimated cost $5K, described as “Installation of temporary overhead protection as per plans in conjunction with NB construction. No change in use, egress or occupancy. Overhead protection to comply with chapter 33 of NYC building code.”
- Alteration, filed Dec 6, 2022, estimated cost $3K, described as “Installation of sprinkler and standpipe system as per plans.”
- Alteration, filed Sep 8, 2022, estimated cost $5K, described as “Install 8' high temporary plywood construction fence in conjunction with full demolition”
- Alteration, filed Apr 8, 2021, estimated cost $60K, described as “Replacement of existing HVAC units at roof. No change in use, egress or occupancy.”
- Alteration, filed Sep 30, 2019, estimated cost $10K, described as “Installation of channel letters”

## Property taxes

- Assessment: $4,007,250
- 2026–27 tax: $494,185
- Market value (city estimate): $8,905,000
- Taxable value: $3,972,870
- Assessed land: $1,083,600
- Assessed improvements: $2,923,650

## Zoning

R7X: floor area ratio 6.77 built, above the 5.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jun 17, 2022: $16,200,000, sold with other lots

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## In the news

[Centric Tops Out at 58-01 Queens Boulevard in Woodside, Queens](https://newyorkyimby.com/2025/09/centric-tops-out-at-58-01-queens-boulevard-in-woodside-queens.html), New York YIMBY, Sep 14, 2025.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
