32-11 Harper Street, Queens
Transportation · built c. 1937 · Block 1790, Lot 1.
Building permits
- New Building, filed Mar 20, 2024, 1 story, described as “Proposed 1-story New Building; related work as per plans.”
- New Building, filed Mar 20, 2024, 1 story, described as “Proposed new 1-story building with mezzanine as per plans.”
- New Building — Non-residential, filed Feb 22, 2024, 5 stories, described as “Proposed new 5-story office building with bulkheads; related work as per plans.”
- Alteration, filed Sep 28, 2026, estimated cost $5K, described as “Installation and use of temporary telehandler construction equipment as per plans filed herewith. This application is filed in conjunction with NB Q01007052-I1.”
- Alteration, filed May 14, 2026, estimated cost $182K, described as “Temporary shoring application for temporary support of the steel decking and construction personnel at the 2ND floor of the proposed structure.”
- Alteration, filed Mar 27, 2026, estimated cost $8.1M, described as “General construction for the garage facility fire rehabilitation as shown herewith. No changes to egress, occipancy or use.”
- Alteration, filed Jan 8, 2025, estimated cost $5K, described as “Installation and use of temporary construction barrier equipment as per plans filed herewith.”
- Alteration, filed Jul 29, 2024, estimated cost $20K, described as “Proposed curb cut installation in conjunction with New Building Job# Q01007052.”
- Alteration, filed Jul 29, 2024, estimated cost $70K, described as “Proposed curb cut installation in conjunction with New Building Job# Q01007052.”
- Alteration, filed May 30, 2024, estimated cost $500K, described as “General construction, structural, and earthwork alterations for proposed climate resiliency work and installation of perimeter flood wall and marine bulkhead; related work as per plans.”
- Alteration, filed Apr 11, 2024, estimated cost $200K, described as “Proposed foundation in conjunction with New Building Job# Q01007106.”
- Alteration, filed Apr 11, 2024, estimated cost $400K, described as “Proposed foundation work in conjunction with New Building Job# Q01007096.”
- Alteration, filed Apr 4, 2024, estimated cost $100K, described as “Installation of temporary dry fire standpipe system in conjunction with construction of New Building (Job# Q01007052); related work as per plans.”
- Alteration, filed Mar 26, 2024, estimated cost $7.0M, described as “Structural alterations for proposed site improvements and installation of waterfront platform and perimeter flood wall; related work as per plans.”
- Alteration, filed Mar 14, 2024, estimated cost $350K, described as “General construction alterations for proposed underground utilities work and early site work in conjunction with New Building Job# Q01007052; related work as per plans.”
- Alteration, filed Mar 5, 2024, estimated cost $5.7M, described as “Proposed foundation work in conjunction with New Building Job# Q01007052.”
- Alteration, filed Feb 19, 2024, estimated cost $50K, described as “The plans enclosed depict the, sequence and means and method for the partial demolition of 32-11 Harper Street, Queens NY. (Bldg A) The building shall be demolished by handheld and mechanical means from exterior, step by step, from top to…”
- Demolition, filed Oct 31, 2023, estimated cost $20K, described as “Full demolition of one story structure using mechanical means.”
- Demolition, filed Oct 31, 2023, estimated cost $15K, described as “Full demolition of one story structure aka bldg C-Fleet Storage, using mechanical means”
- Demolition, filed Sep 27, 2023, estimated cost $100K, described as “Full demolition of two story structure aka Building A-Admin Building using full mechanical means”
- Demolition, filed Sep 27, 2023, estimated cost $20K, described as “Full demolition of one story structure aka Building B-Arterial Storage, using full mechanical means.”
- Alteration, filed Sep 27, 2023, estimated cost $7K, described as “Installation of construction fence.”
- Alteration, filed Oct 27, 2021, estimated cost $58K, described as “Mechanical work type for rehabilitation of portion of existing building to accommodate a new break room, a parts storage office, a locker room and storage area.”
- Alteration, filed Oct 27, 2021, estimated cost $1K, described as “Proposed plumbing work for location sink on break room, in conjunction with general construction work.”
Property taxes
- Assessment
- $5,543,100
- Market value (city estimate)
- $12,318,000
- Taxable value
- $0
- Assessed land
- $3,643,200
- Assessed improvements
- $1,899,900
Zoning
M3-1: floor area ratio 0.98 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 14 ft (NGVD29).
Board and land use applications
- ASPHALT PLANT PILOT PROJECT (City Planning P2002Q0377): Completed. 02DOT001Q: NYC-DOT'S DIVISION OF STREET AND ARTERIAL MAINTENANCE INTEND S TO COMMERCE A PILOT PROJECT TO PRODUCE A HOT MIX ASPHALT U SING A MINIMUM OF 80% ASPHALT EQUIPMENT
- HARPER STREET ASPHALT PLANT (City Planning P2003Q0251): Completed, decided Jan 23, 2004. SITE SELECTION TO CONSTRUCT & OPERATE A NEW ASPHALT PLANT