# 126-55 39th Avenue, Queens

Condominium · built 2024 · Block 1833, Lot 7501.

On Umarelli: https://umarelli.org/nyc/4018337501/126-43-39-avenue

More construction in Flushing: https://umarelli.org/nyc/queens/flushing.md

## Building permits

- New Building — Mid-Rise, filed Nov 3, 2022, estimated cost $38.6M, 534 units, 12 stories, described as “Construction of a new 12 story affordable housing building as per plans filed herewith.”
- New Building — Mid-Rise, filed Nov 3, 2022, estimated cost $26.0M, 347 units, 12 stories, described as “Construction of a new 12 story affordable housing building as per plans filed herewith.”
- Alteration, filed Oct 29, 2026, estimated cost $3K, described as “Installation of non-advertising, non-flashing and illuminated business accessory sign on front facade of existing office at 2ND floor level as tenant fit-out sign. No change in use, egress or occupancy.”
- Alteration, filed Oct 5, 2026, estimated cost $10K, described as “Landlord plumbing work for the initial fit out of a retail space as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed Mar 18, 2026, estimated cost $1K, described as “This application filed only to deliver and install photovoltaic arrays and support equipment on roof. All actual construction work performed under application Q08032719-I1. Solar application to be filed separately. No change in use, egress…”
- Alteration, filed Mar 18, 2026, estimated cost $1K, described as “This application filed only to deliver and install photovoltaic arrays and support equipment on roof. All actual construction work performed under application Q08032504-I1. Solar application to be filed separately. No change in use, egress…”
- Alteration, filed Feb 23, 2026, estimated cost $430K, described as “Interior renovation in existing 1st fl commercial space for proposed grocery & convenience retailer w/ commercial cooking. New hood & exhaust. Associated plumbing work to be filed subsequently. The store address aka 126-28 willets point…”
- Alteration, filed Feb 19, 2026, estimated cost $700, described as “Illuminated non-advertising accessory wall sign - in property lines - parking. No change of use, egress or occupancy.”
- Alteration, filed Feb 19, 2026, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - in property lines - 126-43 39TH avenue willets point commons. No change of use, egress or occupancy.”
- Alteration, filed Feb 19, 2026, estimated cost $700, described as “Illuminated non-advertising accessory wall sign - in property lines - parking. No change of use, egress or occupancy.”
- Alteration, filed Feb 19, 2026, estimated cost $1K, described as “Illuminated non-advertising accessory sign on marquee - in property lines - willets point commons. No change of use, egress or occupancy.”
- Alteration, filed Feb 19, 2026, estimated cost $1K, described as “Illuminated non-advertising accessory sign on marquee - in property lines - willets point commons. No change of use, egress or occupancy.”
- Alteration, filed May 30, 2025, estimated cost $4K, described as “This application is filed for construction equipment, for the construction of a temporary construction office inside the building being built as per the plans filed herewith.”
- Alteration, filed May 7, 2025, estimated cost $5K, described as “Installation of material hoist as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Jan 23, 2025, described as “Temporary placement of a magni rth 6.46 sh telescopic handler used to deliver materials”
- Alteration, filed Jan 15, 2025, described as “Temporary placement of a magni rth 6.46SH or rth 5.35S tele handler to deliver materials”
- Alteration, filed Aug 13, 2024, estimated cost $5K, described as “Installation of 300 psf sidewalk shed as per plans. All equipment shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Jun 18, 2024, estimated cost $10K, described as “Installation of pipe scaffolding and material hoist as per plans. All equipment shall comply with chapter # 33 of the 2022 code. No change in use occupancy or egress under this application.”
- Alteration, filed Oct 3, 2023, described as “Retaining wall to support a new intersection at roosevelt avenue beteween the roosevelt avenue bridge and proposed 39TH avenue.”
- Alteration, filed Sep 6, 2023, estimated cost $13K, described as “Installation of construction fence for NB construction as per plans. No change in use occupancy or egress under this application. Construction fence shall comply with chapter 33 of the 2022 NYC building code.”
- Alteration, filed Aug 3, 2023, estimated cost $2.4M, described as “Application filed to provide concrete retaining wall and test piles as per plans.”
- Alteration, filed Aug 3, 2023, estimated cost $5.0M, described as “Application filed to provide concrete platform, test piles & test pits at dot abutment as per plans.”
- Alteration, filed Jul 28, 2023, estimated cost $3.0M, described as “Construction of utilities, retaining wall, sidewalk, landscaping as per plans filed herewith.”
- Alteration, filed Jul 27, 2023, estimated cost $3.0M, described as “Construction of utilities and stormwater system as per plans filed herewith.”
- Alteration, filed May 23, 2023, estimated cost $4.0M, described as “Support of excavation on vacant land for a soil mix wall to facilitate roadway construction.”

## Property taxes

- 2026–27 tax: $10,528,335
- Market value (city estimate): $209,268,000
- Taxable value: $85,931,041
- Condo units with their own tax lots: 11

## Zoning

C4-4: floor area ratio 4.60 built, above the 3.44 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 14 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
