Condominium · 88 units · built 1963 · Block 2248, Lot 7501.
Building permits
- Alteration, filed Oct 28, 2026, estimated cost $10K, described as “Installation of pipe scaffold in elevator shaft "b" as per plans. Pipe scaffolding shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Oct 7, 2026, estimated cost $17K, described as “Installation of pipe scaffolding as per plans. Pipe scaffold shall comply with chapter #33 of the 2022 code. No change in use, egress or occupancy under this application.”
- Alteration, filed Aug 12, 2026, estimated cost $3.0M, described as “(forest hills jewish center) filing herewith architectural drawings for interior renovation and non-structural demo work as shown on plans. There will be no change of use, ocupancy or egress under this application.”
- Alteration, filed Jul 29, 2026, estimated cost $100K, described as “(forest hills jewish center) filing herewith sprinkler plans for the addition/modification to an exsting sprinkler system as shown on plans. There will be no change of use, occupancy or egress under this application.”
- Alteration, filed Jul 29, 2026, estimated cost $100K, described as “(forest hills jewish center) modification to an existing standpipe system as shown on plans. There will be no change of use, occupancy or egress under this application.”
- Alteration, filed Nov 7, 2025, estimated cost $20K, described as “Installation of temporary contractor shed associated with interior renovation of the building. There is no change to use, egress, occupancy, or fire-protection. All demolition filed under DOB now# Q01022249-I1 & Q01004604-I1.”
- Alteration, filed Apr 7, 2025, estimated cost $80K, described as “Temporary pipe scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 28, 2024, estimated cost $1.0M, described as “Filing for site preparation for abatement through entire building. Floor by floor abatement, non-structural demolition from roof to sub cellar 2. Abatement and demolition of non-load bearing facade along all exposures”
- Alteration, filed Mar 18, 2024, estimated cost $500K, described as “Filing for excavation and support of excavation work. In conjunction with Q01004604-I1”
- Major Renovation — Conversion, filed Mar 6, 2024, estimated cost $15.4M, 145 units added, 8 stories, described as “(HUB job) Convert existing 6 story hospital building to an 8 story residential AIRS and Community Facility building under ZR Article 1 Chapter 5, Vertical and Horizontal enlargement. Obtain certificate of occupancy. One zoning lot and two…”
Property taxes
- Assessment
- $3,222,000
- 2026–27 tax
- $380,097
- Market value (city estimate)
- $7,160,000
- Taxable value
- $3,144,151
- Assessed land
- $1,192,950
- Assessed improvements
- $2,029,050
- Condo units with their own tax lots
- 2
Zoning
R7A: floor area ratio 4.55 built, above the 4.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.