80-01 Metropolitan Avenue, Queens
Other · Block 3071, Lot 1.
Building permits
- New Building — Non-residential, filed Aug 6, 2024, 2 stories, described as “New cellar & 2 story mausoleum with poured in place reinforced concrete vaults for 3,746 casket spaces, and 2,730 prefabricated cremation niches. The building will have an elevator and a secondary exterior stairway.”
- Alteration, filed Feb 27, 2026, estimated cost $150K, described as “New Steel platform in the depressed areaway for the air-cooled chiller at the Resurrection Mausoleum at St. John Cemetery.”
- Alteration, filed Feb 24, 2026, estimated cost $600K, described as “Replacing the AC system at Resurrection Mausoleum ,St. John Cemetery. Removal of the cooling tower, removal of (2) water cooled chillers and associated pumps, electrical and controls. New air-cooled chiller system to be installed in the…”
- Alteration, filed Feb 13, 2023, estimated cost $32K, described as “Register replacement low pressure gas fired boiler. No change in use, egress, or occupancy under this application.”
- Alteration, filed Sep 29, 2022, estimated cost $55K, described as “Install stainless steel chimney liner in existing chimney. No change in use, egress or occupancy.”
- Alteration, filed Sep 29, 2022, estimated cost $202K, described as “Replace two (2) boilers and two (2) burners. Change fuel from #2 oil to #2 oil and gas. No change in use, egress or occupancy.”
- Alteration, filed Sep 29, 2022, estimated cost $25K, described as “Install new gas line and connect to two dual fuel boilers/burners. Replacement boilers/burners filed under separate DOB now build application. No change in use, egress or occupancy.”
- Alteration, filed Apr 20, 2022, estimated cost $50K, described as “Installation of one (1) dual fired boiler.”
- Alteration, filed Apr 20, 2022, estimated cost $4K, described as “Upgrading gas line and meter.”
- Alteration, filed Jan 27, 2022, estimated cost $5K, described as “Remove plumbing fixtures and keep 1 existing powder room (1 toilet & 1 lav) in conjunction with alt type i application #400399742.”
- Alteration, filed Jul 27, 2021, estimated cost $5K, described as “Installation of construction fence to protect full demolition of St John's Chapel.”
- Alteration, filed May 21, 2021, estimated cost $3K, described as “Framing for dunnage to support 2 mechanical units.”
- Alteration, filed Sep 11, 2020, estimated cost $85K, described as “Installation of (2) 18 Ton Rooftop Heating/Cooling Units”
- Alteration, filed Aug 13, 2019, estimated cost $20K, described as “Install a temporary construction wood fence in conjunction with the demolition application #421737516.”
- Alteration, filed Jul 26, 2019, estimated cost $1K, described as “Install a temporary wood construction fence in conjunction NB# 421720392 building #3”
- Alteration, filed Jul 26, 2019, estimated cost $1K, described as “Install a temporary wood fence in conjunction NB# 421720418 building #1”
- Alteration, filed Jul 26, 2019, estimated cost $1K, described as “Install a temporary wood construction fence in conjunction NB# 421720409 building #2”
- Alteration, filed Jul 26, 2019, estimated cost $1K, described as “Install a temporary wood construction fence in conjunction NB# 421720383 building #4”
Property taxes
- Assessment
- $64,599,750
- Market value (city estimate)
- $143,555,000
- Taxable value
- $0
- Assessed land
- $35,207,100
- Assessed improvements
- $29,392,650
Zoning
R3-2: floor area ratio 0.00 built, 0.75 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.