28-10 Whitestone Expressway, Queens
Industrial · built 2023 · Block 4282, Lot 10.
Building permits
- New Building — Non-residential, filed Mar 9, 2022, estimated cost $30.7M, 3 stories, described as “Filing of new 3-story building for warehousing, vehicle storage, and accessory parking as per plans filed herewith.”
- Alteration, filed Oct 29, 2026, estimated cost $2.6M, described as “Existing building of approximately 313,496SF warehouse with parking above.primary project impacted space of approximately 85,725SF at first floor including employee breakroom and facilities. Minor work at second floor including…”
- Alteration, filed Aug 30, 2023, estimated cost $5K, described as “Installation of a temporary scaffold stair a & stair c as per plans in conjunction with general construction. No change in use, egress or occupancy. Scaffold installed in accordance with 2022 NYC building code, chapter 33”
- Alteration, filed May 16, 2023, described as “Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed May 16, 2023, described as “Installation of supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Sep 21, 2022, described as “Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 23, 2022, estimated cost $1K, described as “Structural modifications filed in conjunction with new building job #Q00688595-I1 to floors 1-3 and roof as per plans filed herewith. No change to use, egress, or occupancy. Note: Open web joists are utilized in this project.”
- Alteration, filed May 5, 2022, estimated cost $1K, described as “Plumbing modifications filed in conjunction with new building job #Q00688595-I1 to floors 1-3 and roof as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed May 5, 2022, estimated cost $1K, described as “Sprinkler modifications filed in conjunction with new building job #Q00688595-I1 to floors 1-3 and roof as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed May 5, 2022, estimated cost $1K, described as “Standpipe modifications filed in conjunction with new building job #Q00688595-I1 to floors 1-3 and roof as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed May 5, 2022, estimated cost $1K, described as “Mechanical modifications filed in conjunction with new building job #Q00688595-I1 to floors 1-3 and roof as per plans filed herewith. No change to use, egress, or occupancy.”
- Alteration, filed Mar 23, 2022, estimated cost $1K, described as “Plumbing modifications filed in conjunction with new building job #Q00688595-I1. No change to use, egress, or occupancy.”
- Alteration, filed Mar 23, 2022, estimated cost $1K, described as “General construction modifications in conjunction with new building job #Q00688595-I1.”
Property taxes
- Assessment
- $16,317,450
- 2026–27 tax
- $495,345
- Market value (city estimate)
- $36,261,000
- Taxable value
- $14,904,572
- Assessed land
- $4,869,000
- Assessed improvements
- $11,448,450
Tax breaks
- ICAP abatement, through Jun 30, 2040, a $1,121,503 credit this tax year.
Zoning
M1-1: floor area ratio 1.46 built, above the 1.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 13 ft (NGVD29). FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 12 ft (NAVD88).
Recent sales
- Feb 18, 2026: $92,000,000, 252,890 sq ft ($364 per sq ft)
- Feb 21, 2025: $35,828,200
Open-market sales since 2016, from the Department of Finance’s sales files.