# 34-09 College Point Blvd, Queens

Industrial · built 2019 · Block 4945, Lot 34.

On Umarelli: https://umarelli.org/nyc/4049450034/34-09-college-point-blvd

More construction in Flushing: https://umarelli.org/nyc/queens/flushing.md

Every lot on block 4945: https://umarelli.org/nyc/queens/4945.md

## Building permits

- Alteration, filed Jul 16, 2026, estimated cost $7K, described as “Indirectlly illuminated non-advertising accessory wall sign - in property lines - manhattan. No change of use, egress or occupancy.”
- Alteration, filed Jul 16, 2026, estimated cost $7K, described as “Illuminated non-advertising accessory wall sign - in property lines - manhattan mini storage. No change of use, egress or occupancy.”
- Alteration, filed Jan 16, 2026, estimated cost $817K, described as “Installation of photovoltaic solar array on existing roof system as per plans”
- Alteration, filed Jul 14, 2025, estimated cost $750, described as “Reface only of illuminated non-advertising double-face projecting accessory sign - in property lines - extraspace storage. No change of use, egress or occupancy.”
- Alteration, filed Jul 14, 2025, estimated cost $2K, described as “Non-illuminated non-advertising accessory sign - in property lines - extra. No change of use, egress or occupancy.”
- Alteration, filed Jul 14, 2025, estimated cost $3K, described as “Non-illuminated non-advertising accessory wall sign - in property lines - storage. No change of use, egress or occupancy.”
- Alteration, filed Jul 14, 2025, estimated cost $3K, described as “Non-illuminated non-advertising accessory wall sign - in property lines - space. No change of use, egress or occupancy.”
- Alteration, filed Jul 14, 2025, estimated cost $7K, described as “Illuminated non-advertising accessory wall sign - in property lines - extraspace storage. No change of use, egress or occupancy.”
- Alteration, filed Jul 14, 2025, estimated cost $3K, described as “Non-illuminated non-advertising accessory sign - in property lines - storage. No change of use, egress or occupancy.”
- Alteration, filed Jul 14, 2025, estimated cost $3K, described as “Non-illuminated non-advertising accessory sign - in property lines - space. No change of use, egress or occupancy.”
- Alteration, filed Jul 14, 2025, estimated cost $1K, described as “Non-illuminated non-advertising accessory wall sign - in property lines - extra. No change of use, egress or occupancy.”
- Alteration, filed Jul 14, 2025, described as “Non-illuminated non-advertising accessory sign on existing entrance canopy - in property lines - office. No change of use, egress or occupancy.”
- Alteration, filed Aug 14, 2020, estimated cost $52K, described as “Erect indirect-illuminated accessory channel letter wall sign-b @college point blvd elevation, non-flashing, non-advertising sign, no change in use, egress, or occupancy”
- Alteration, filed Aug 14, 2020, estimated cost $2K, described as “Erect illuminated accessory d/f blade wall sign-d @college point blvd elevation, non-flashing, non-advertising sign, no change in use, egress, or occupancy”
- Alteration, filed Aug 14, 2020, estimated cost $23K, described as “Erect illuminated, accessory business channel letter wall sign-a @collins place elevation, no change to use, egress or occupation”
- Alteration, filed Oct 23, 2018, described as “Installation of heavy duty sidewalk shed as per plans. No change in use, egress or occupancy.”
- Alteration, filed Apr 10, 2018, estimated cost $1K, described as “Installation of temporary construction fence.”

## Property taxes

- Assessment: $12,280,500
- 2026–27 tax: $321,622
- Market value (city estimate): $27,290,000
- Taxable value: $9,779,850
- Assessed land: $1,796,400
- Assessed improvements: $10,484,100

## Tax breaks

- ICAP abatement, through Jun 30, 2046, a $739,296 credit this tax year.

## Zoning

M2-1: floor area ratio 2.98 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Jan 22, 2026: $100,741,078, 158,669 sq ft ($635 per sq ft)
- Dec 1, 2023: $72,000,000
- Nov 18, 2016: $21,000,000

Open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Variance or special permit (Board of Standards and Appeals 221-08-BZ): Variance or special permit, Withdrawn, filed Aug 28, 2008, decided Nov 1, 2011. Variance (§72-21) to permit the development of a transient hotel, contrary to district use regulations. M2-1 zoning district.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
