# 35-32 Leavitt Street, Queens

Condominium · 48 units · built 2021 · Block 4960, Lot 7503.

On Umarelli: https://umarelli.org/nyc/4049607503/35-32-leavitt-street

More construction in Flushing: https://umarelli.org/nyc/queens/flushing.md

Every lot on block 4960: https://umarelli.org/nyc/queens/4960.md

## Building permits

- No Work, filed Mar 7, 2025
- No Work, filed Mar 7, 2025
- Alteration, filed Jan 3, 2025, described as “Suspended Scaffold Installation For Facade Restoration with Bosun Chair”
- Alteration, filed Sep 16, 2024, estimated cost $2K, described as “Illuminated non-advertising accessory tenant directory sign on ground structure filed under job number: 421644787 in property lines - blu ember moli. No change of use, egress or occupancy.”
- Alteration, filed Dec 7, 2023, described as “Facade repair work.”
- Alteration, filed Nov 7, 2023, estimated cost $2K, described as “Illuminated non advertising double sided accessory monument sign on existing concrete slab - inside property line - westin. No change of use, egress or occupancy.”
- Alteration, filed Nov 7, 2023, estimated cost $2K, described as “Illuminated non-advertising accessory wall sign in property lines westin. No change of use, egress or occupancy.”
- Alteration, filed Nov 7, 2023, estimated cost $2K, described as “Illuminated non-advertising accessory wall sign in property lines westin. No change of use, egress or occupancy.”
- Alteration, filed Nov 7, 2023, estimated cost $2K, described as “Illuminated non-advertising accessory wall sign in property lines westin. No change of use, egress or occupancy.”
- Alteration, filed Dec 2, 2022, estimated cost $4K, described as “Installation of temporary suspended scaffold per drawings during NB const, filed sep. Suspended scaffold shall comply with ch 33 of the NYC bc. No change in use, occupancy oregress under this application.”
- Alteration, filed Sep 8, 2022, estimated cost $1K, described as “Installation and use of temporary mini crane equipment as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jul 27, 2022, estimated cost $1K, described as “Installation and use of temporary mini crane equipment as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jul 11, 2022, estimated cost $1K, described as “Installation and use of temporary material platform as per plans filed herewith. No change in use, egress or occupancy.”
- Alteration, filed May 25, 2022, estimated cost $7K, described as “Herewith filing for the installation of new fuel storage tanks in connection with emergency generator.”
- Alteration, filed May 18, 2021, estimated cost $10K, described as “Installation of two 5,000 lbs gjj S270/270GD dual car personal/material hoists as per plan in conjunction with NB 421644787. Work shall comply with 2014 building code. No change in use, egress, or occupancy.”
- Alteration, filed Sep 23, 2020, estimated cost $5K, described as “Installation of sidewalk shed as per plans. Sidewalk shed live load will be 300 psf, shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.”
- Alteration, filed Aug 18, 2020, estimated cost $1K, described as “Propose 8' height plywood construction fence on side of leavitt street in conjunction with NB#421644787.”
- Alteration, filed Jul 15, 2020, estimated cost $1K, described as “File 30'-0" curb cut, including (2) 2'-6" splays, 102'-8" from the intersection of northern blvd and leavitt street. Filed in conjunction with new building # 421644787. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 15, 2020, estimated cost $1K, described as “File 12'-00"curb cut, including (2) 2'-6" splays, 102'-6" from the intersection of northern blvd and leavitt street. Filed in conjunction with new building # 421644787. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 15, 2020, estimated cost $1K, described as “File 12'-8"curb cut, including (2) 2'-6" splays, 72' from the intersection of northern blvd and leavitt street. Filed in conjunction with new building # 421644787. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 15, 2020, estimated cost $1K, described as “File 12'-00"curb cut, including (2) 2'-6" splays, 227 feet from the intersection of northern blvd and leavitt street. Filed in conjunction with new building # 421644787. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 10, 2020, estimated cost $65K, described as “Installation of temporary standpipe with an air alarm in conjunction with new building job no: 421644787”

## Property taxes

- Assessment: $19,894,508
- 2026–27 Tax: $1,910,084
- Market value (city estimate): $44,210,003
- Taxable value: $17,148,481
- Assessed land: $4,527,904
- Assessed improvements: $15,366,604
- Condo units with their own tax lots: 52

## Zoning

C4-3: floor area ratio 6.31 built, above the 3.40 base zoning allows, which bonuses, transfers or older rules can permit.

## Recent sales

- Sep 10, 2025: $1,122,575, Unit PH-E
- Sep 10, 2025: $927,071, Unit PH-I
- Aug 18, 2025: $1,326,225, Unit PH-A
- Aug 1, 2025: $997,885, Unit PH-G
- Mar 25, 2025: $878,195, Apt 12E
- Mar 25, 2025: $913,834, Apt 12I
- Mar 25, 2025: $618,541, Unit PH-C
- Mar 25, 2025: $939,290, Unit PH-H
- Mar 21, 2025: $1,000,385, Apt 12G
- Mar 20, 2025: $870,662, Apt 10I

The 10 most recent of 43 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
