# 138-18 Northern Boulevard, Queens

New or merged lot · Block 5010, Lot 28.

The city hasn’t published tax or zoning records for this lot yet; new and merged lots usually appear within a few months.

On Umarelli: https://umarelli.org/nyc/4050100028/138-18-northern-boulevard

## Building permits

- Alteration, filed Feb 26, 2026, estimated cost $2K, described as “Erect an illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. No change in use, egress or occupancy.”
- Alteration, filed Feb 26, 2026, estimated cost $6K, described as “Erect an non-illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. No change in use, egress or occupancy.”
- Alteration, filed Nov 18, 2025, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed Nov 14, 2025, estimated cost $500K, described as “This MH application is filed associated with Q01269891-I1 to install new HVAC system, refrigeration system and related ventilation and duct works.”
- Alteration, filed Aug 18, 2025, estimated cost $360K, described as “Interior renovation for existing retail space on 1ST floor and cellar level as per plans. No change in use, egress and occupancy.”
- Alteration, filed Jun 12, 2025, estimated cost $49K, described as “Minor change of sprinkler system on 2ND floor, in conjunction with DOB now job# Q08026746-I1.”
- No Work, filed May 23, 2025
- Alteration, filed May 9, 2025, estimated cost $98K, described as “Proposed mechanical work of heating & air conditioning systems on the second floor & roof. In conjunction with general construction DOB now job# Q08026746-I1.”
- Alteration, filed May 7, 2025, estimated cost $80K, described as “Proposed plumbing work on caller and 2ND floor, in conjunction with DOB now job# Q08026746-I1.”
- Alteration, filed Jan 10, 2025, described as “Installation of temporary suspended scaffolds per plan submitted. Work shall comply with 2022 building code chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Oct 22, 2024, estimated cost $5K, described as “Use of temporary telehandler construction equipment as per plans filed herewith. This application is filed in conjunction with NB-Q08026746.”
- Alteration, filed Jun 9, 2023, estimated cost $4K, described as “Installation of temporary overhead protection as per plans. No change in use, egress or occupancy.”
- Alteration, filed Mar 10, 2023, described as “Installation of temporary sidewalk shed as per plans. No change in use, egress or occupancy.”
- Major Renovation — Non-residential, filed Oct 28, 2022, estimated cost $7.0M, 2 stories, described as “Proposed 2 story with cellar commercial use building with horizontal and vertical enlargement. Obtain new c of o.”
- Alteration, filed Oct 17, 2022, estimated cost $2K, described as “Proposed temporary construction fence for main building construction. No change in use, egress or occupancy.”

## In the news

[The Sunlight Rises at 138-18 Northern Boulevard in Flushing, Queens](https://newyorkyimby.com/2025/01/the-sunlight-rises-at-138-18-northern-boulevard-in-flushing-queens.html), New York YIMBY, Jan 8, 2025.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
