# 40-28 College Point Boulevard, Queens

Condominium · 280 units · built 2008 · Block 5066, Lot 7503.

On Umarelli: https://umarelli.org/nyc/4050667503/40-28-college-point-boulevard

More construction in Flushing: https://umarelli.org/nyc/queens/flushing.md

Every lot on block 5066: https://umarelli.org/nyc/queens/5066.md

## Building permits

- Alteration, filed Oct 27, 2026, estimated cost $5K, described as “Propose new illuminated business sign for existing partial first floor commercial space. No change to use, egress or occupancy.”
- Alteration, filed Mar 3, 2026, estimated cost $4K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Mar 3, 2026, estimated cost $5K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Mar 3, 2026, estimated cost $7K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Oct 17, 2025, estimated cost $80K, described as “Two generators installed in open space. Each generator consist of belly tank, main breaker, battery charger, muffler, weatherproof attenuation enclosure.”
- Alteration, filed Sep 11, 2025, estimated cost $228K, described as “Proposed to remove interior non-load bearing partitions & finishes. Install new non-load bearing partitions & finishes as shown on plans.no change of use, egress or occupancy. Application filed in conj. W/Q01256215-S1 (st), S2 (ms), S3…”
- Alteration, filed Jul 25, 2025, described as “IRA application for FISP inspections and repairs”
- No Work, filed Feb 10, 2025
- Alteration, filed Dec 18, 2024, estimated cost $32K, described as “Chase - Replacement of 2 ton unit in ATM Room and related construction as per plans filed herewith. No change in use, egress, or occupancy,”
- Alteration, filed Oct 7, 2024, estimated cost $800, described as “Install illuminated non-advertising accessory wall sign. No change of use, egress or occupancy”
- Alteration, filed Aug 28, 2024, estimated cost $61K, described as “Interior alt of exist retail space on 3FL. Expand existing receiving area into former area of the combined fitting rm. Removal of exist fitting rm partitions & lighting. Construct new partition separating receiving from sales area. New…”
- Alteration, filed Aug 12, 2024, estimated cost $3.3M, described as “Install partitions, ceilings, doors and hardware for restaurant on floors 3 & 5. No change to use, egress or occupancy.”
- No Work, filed Jul 31, 2024
- Alteration, filed Feb 5, 2024, estimated cost $13K, described as “SP # D02C and D02A. Modification to existing sprinkler system to accommodate new layout for Bath and Body Works. No change in egress, use or occupancy.”
- Alteration, filed Jan 11, 2024, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - foot locker. No change of use, egress or occupancy.”
- Alteration, filed Jan 11, 2024, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - foot locker. No change of use, egress or occupancy.”
- Alteration, filed Jan 11, 2024, estimated cost $1K, described as “Illuminated non-advertising accessory wall sign - foot locker. No change of use, egress or occupancy.”
- Alteration, filed Dec 1, 2023, estimated cost $11K, described as “SPACE # D02C and DOC2A. Install new plumbing fixtures to accommodate new tenant build out for BATH AND BODY Works per plans filed herewith. No change in egress use or occupancy.”
- Alteration, filed Dec 1, 2023, estimated cost $60K, described as “SPACE # D02C / DO2A. Mechanical work associated with tenant build out for BATH AND BODY WORK WHITE BARN as per plans filed herewith. No change in egress, use or occupancy.”
- Alteration, filed Dec 1, 2023, estimated cost $39K, described as “SPACE NUMBER D02C - Structural work associated with new tenant build out for BATH AND BODY WORKS WHITE BARN as per plans filed herewith. No change in egress, use or occupancy..”
- Alteration, filed Dec 1, 2023, estimated cost $105K, described as “Interior renovation to existing commercial space to be occupied by BATH AND BODY WORKS SP # D02C and D02A. . Remove/install non load bearing partitions, flooring, ceilings, finishes, modify storefront per plans filed herewith. No change in…”
- Alteration, filed Sep 7, 2023, estimated cost $230K, described as “8785-Herewith filing to buildout existing retail space (footlocker) as per plans.Work to include new Non load bearing partitions, floor coverings, millwork, and fixtures. No change in egress use group or occupancy. Pro Cert requested.”
- Alteration, filed Aug 8, 2023, estimated cost $6K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Aug 8, 2023, estimated cost $5K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”
- Alteration, filed Aug 8, 2023, estimated cost $6K, described as “Erect an illuminated business accessory wall sign. No change in use, egress, or occupancy.”

49 more, older permits are in this building’s full list on the map: https://umarelli.org/nyc/4050667503/40-28-college-point-boulevard.

## Property taxes

- Assessment: $20,441,692
- 2026–27 Tax: $2,185,952
- Market value (city estimate): $45,425,997
- Taxable value: $18,499,374
- Assessed land: $2,258,086
- Assessed improvements: $18,183,606
- Condo units with their own tax lots: 280

## Tax breaks

- Co-op and Condo Abatement, with no end date, a $115,188 credit this tax year.

## Recent sales

- Sep 18, 2026: $888,000, Apt 11E
- May 26, 2026: $860,000, Apt 1203
- May 1, 2026: $660,000, Apt 805
- Apr 6, 2026: $1,080,000, Apt PH2-G
- Mar 24, 2026: $945,000, Apt PH2-D
- Mar 16, 2026: $788,000, Apt PH102
- Feb 6, 2026: $900,000, Apt 16E
- Jan 22, 2026: $960,000, Apt PH2-L
- Jan 15, 2026: $860,000, Apt 1202
- Dec 31, 2025: $629,900, Apt 12I

The 10 most recent of 113 open-market sales since 2016, from the Department of Finance’s sales files.

## Flood zone

Current FEMA flood map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 14 ft (NGVD29). FEMA’s preliminary map: zone X, minimal flood hazard.

## Board and land use applications

- Skyview Parc Second Amended Declaration (City Planning P2015Q0571): Completed, decided Oct 4, 2016. This is an application by Onex Real Estate for the second amendment to a Restrictive Declaraction to accommodate a phased development plan and the construction of a required waterfront public access area on Block 5066, Lot 7501, in…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
