23-70 Waters Edge Drive, Queens
Public school · built 2025 · Block 5958, Lot 30.
Building permits
- New Building — Non-residential, filed Jan 9, 2023, estimated cost $99.0M, 5 stories, described as “Herewith filing New 5-story School Building Q388”
- Alteration, filed Oct 8, 2026, estimated cost $561K, described as “Installation of 80.19 kw solar energy system on roof. No change of occupancy, use or egress.”
- Alteration, filed Mar 10, 2026, estimated cost $30K, described as “Chute installation for debris removals.”
- Alteration, filed Jul 8, 2025, estimated cost $25K, described as “Installation of sidewalk bridge for overhead rotection of the public from areas of exposure during construction work.”
- Alteration, filed May 8, 2025, estimated cost $525K, described as “Installation of 82.215 kw solar energy system on roof. No change of occupancy, use or egress.”
- Alteration, filed Apr 24, 2025, estimated cost $3K, described as “PS 388Q - Filing for Temporary Standpipe during construction.”
- Alteration, filed Mar 3, 2025, estimated cost $3K, described as “Soe utilities in conjunction with 4 story new school building.”
- Alteration, filed Jan 15, 2025, estimated cost $10K, described as “Installation of construction fence for public protection during construction work.”
- Alteration, filed Oct 9, 2024, estimated cost $360K, described as “SOE for NB & Detention System in conjunction with new 4 story school building.”
- Alteration, filed Aug 4, 2023, estimated cost $56K, described as “Installation of temporary fence on behalf of contractor”
- Alteration, filed Aug 4, 2023, estimated cost $300K, described as “Filing for shoring of excavation on behalf of contractor”
- Alteration, filed Apr 4, 2023, estimated cost $1K, described as “Rooftop emergency generator with fuel oil tank, piping, and transfer pumps”
- Alteration, filed Apr 4, 2023, estimated cost $1K, described as “PS 388Q - Automatic wet sprinkler system, with sprinkler booster pump. Floor control valve assemblies at each floor. Class 1 manual wet standpipe. FHV in recessed cabinets within each stairway.”
- No Work, filed Mar 29, 2023
- No Work, filed Mar 24, 2023
- Alteration, filed Feb 14, 2023, estimated cost $1K, described as “Herewith filing Early Package Site work”
- Alteration, filed Nov 16, 2017, estimated cost $6K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
Property taxes
- Assessment
- $3,298,050
- Market value (city estimate)
- $7,329,000
- Taxable value
- $0
- Assessed land
- $3,298,050
Zoning
R5: floor area ratio 1.92 built, above the 1.50 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year.
Recent sales
- Jan 26, 2022: $11,000,000
Open-market sales since 2016, from the Department of Finance’s sales files.