226-26 Union Turnpike, Queens
Co-op · 191 units · built 1956 · Block 7912, Lot 50.
Building permits
- Alteration, filed Dec 18, 2023, estimated cost $13K, described as “Conversion of exising storage room to proposed acessory tenant laundry room within existing fire rated demising walls. Plumbing work filed separately under DOB job no Q00894586-S1”
- Alteration, filed Mar 21, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 16, 2023, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. Live load 300PSF.”
- Alteration, filed Mar 9, 2023, estimated cost $200K, described as “Alt-2 Facade Repairs, repointing, brick replacement, windowsill replacement etc. No change in use, egress, or occupancy.”
- Alteration, filed Mar 9, 2023, estimated cost $200K, described as “Alt-2 Facade Repairs. Repointing, brick replacement, windowsill replacement etc. No change in use, egress, or occupancy.”
- Alteration, filed Jan 31, 2023, estimated cost $3K, described as “Alt-2 filing: bathroom floor framing repairs. No change in use, egress or occupancy.”
- Alteration, filed Dec 19, 2022, estimated cost $37K, described as “Dish Network - Installation of new cabinet on wall mount on roof. Installation of new antenna sectors with related RRH units and GPS on roof. Related service connection. All work in compliance with TPPN 5/98. No change to occupancy, use,…”
- Alteration, filed Oct 31, 2022, estimated cost $38K, described as “Replacement of existing 35KW natural gas generator with new 50KW natural gas generator on roof with related gas piping modifications filed under DOB application no. Q00783076. No change in use, egress, or occupancy.”
- Alteration, filed Oct 31, 2022, estimated cost $10K, described as “Proposed modifications to existing gas piping system (incl. Gas meter installation) at bsmnt level and building exterior to roof in service of the new generator replacement filed under DOB application no. Q00783068. No change in use,…”
- Alteration, filed Sep 29, 2022, estimated cost $30K, described as “Alt-2 Facade Repairs. No change in use, egress, or occupancy.”
- Alteration, filed Sep 19, 2022, estimated cost $14K, described as “Plumbing work filed in conjunction with the apartment renovation as per plan submitted herewith. No change in use, egress, or occupancy under this application”
- Alteration, filed Sep 19, 2022, estimated cost $71K, described as “Interior renovation of existing apartment unit as per plan. No change in use, egress, or occupancy under this application”
- Alteration, filed May 26, 2022, estimated cost $1K, described as “Construction of non load bearing partition separating living room from adjoining space.”
- Alteration, filed Jan 5, 2022, estimated cost $25K, described as “Decommission of existing Sprint site. Remove antennas and equipment from the roof.”
- Alteration, filed Jul 16, 2021, estimated cost $15K, described as “Alt 2 filing to repair cracked and/or deteriorated brick facade & window lintels/sills as per plans. No change in use, egress, or occupancy.”
- Alteration, filed Oct 4, 2019, estimated cost $4K, described as “Filing plumbing work conjunct with JOB#421914502 as per plan. No change in use, egress or occupancy.”
- Alteration, filed Sep 18, 2019, estimated cost $17K, described as “Install 1-1/4 in. gas piping to new gas drops from 8 exist. dryers to exist.; install new vacuum breakers at each hose connection for 8 existg. washing machines. Install 2 new automatic sprinklers & assoc.piping @ existg. dryer”
- Alteration, filed Aug 5, 2019, estimated cost $15K, described as “Supported scaffold filing as per chimney repairs. No change in use, egress or occupancy.”
- Alteration, filed Jan 8, 2019, estimated cost $15K, described as “Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress or occupancy.”
- Alteration, filed Jan 8, 2019, estimated cost $15K, described as “Installation of temporary sidewalk shed as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $8,859,600
- 2026–27 Tax
- $757,626
- Market value (city estimate)
- $19,688,000
- Taxable value
- $8,101,321
- Assessed land
- $1,543,500
- Assessed improvements
- $7,316,100
Tax breaks
- Co-op and Condo Abatement, with no end date, a $253,314 credit this tax year.
Zoning
R5D: floor area ratio 1.14 built, 2.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 30, 2026: $340,000
- Apr 7, 2026: $280,000
- Apr 7, 2026: $220,000
- Mar 26, 2026: $370,000
- Dec 4, 2025: $365,000
- Nov 20, 2025: $280,000
- Nov 17, 2025: $278,000
- Oct 17, 2025: $285,000
- Oct 10, 2025: $390,000
- Oct 9, 2025: $390,000
The 10 most recent of 114 open-market sales since 2016, from the Department of Finance’s sales files.