225-16 Hillside Avenue, Queens
Co-op · 168 units · built 1951 · Block 7943, Lot 200.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Jan 13, 2026, estimated cost $482K, described as “Filing herewith plans and application for additional 11 voluntary EV car parking spaces, with 6 EV stations and extend existing asphalt driveway. Requesting new certificate ofoccupancy. No work to existing 14 car garage.”
- Alteration, filed Dec 23, 2025, estimated cost $50K, described as “Filing herewith plans and application for emergency repair to existing garage, front and side wall of 229-11gar 87 avenue. Vehicle damaged the structural wall of this single story garage. Filing to address complaint # 4A20468.”
- Alteration, filed Sep 3, 2025, estimated cost $205K, described as “Convert existing paved clothes drying area to voluntary EV charging parking space in accordance w/ 2022 NYC building codes and con-edison electric vehicle charging programs. No change to zoning. See separate dry well plumbing application.”
- Alteration, filed Oct 7, 2024, estimated cost $38K, described as “Filing herewith plans and application to make cosmetic rehabilitation repairs to existing accessory garage, brick columns at base of columns at ( 229-11 gar, 87 avenue ) filing to address ecb violation: 039123922J.”
- Alteration, filed Aug 6, 2024, estimated cost $10K, described as “Filing herewith application for direct-replacement of kitchen sink, dishwasher, lav and toilet. Remove existing tub and replace with shower, with new washing machine. Application filed in conjuction with 440407249. ( expired due to…”
- Alteration, filed Jul 3, 2024, estimated cost $10K, described as “Convert rear window into door exit w/ new stoop. No change to use, occupancy, and egress.”
- Alteration, filed Nov 16, 2023, estimated cost $8K, described as “Replace kitchen sink & combined electric washer/dryer”
- Alteration, filed Nov 16, 2023, estimated cost $41K, described as “Internal renovation on 1st and 2nd floors and installing ceiling lights”
- Alteration, filed Aug 1, 2023, estimated cost $7K, described as “Repairs, replacement and maintenance of rear brick veneer facade. No change to building size. No change to lot coverage. No change to zoning. No change to occupancy, egress, or use. No changes to site, plot, or topography.”
- Alteration, filed Aug 1, 2023, estimated cost $7K, described as “Repairs, replacement and maintenance of rear brick veneer facade. No change to building size. No change to lot coverage. No change to zoning. No change to occupancy, egress, or use. No changes to site, plot, or topography.”
- Alteration, filed Aug 1, 2023, estimated cost $7K, described as “Repairs, replacement and maintenance of rear brick veneer facade. No change to building size. No change to lot coverage. No change to zoning. No change to occupancy, egress, or use. No changes to site, plot, or topography.”
- Alteration, filed Oct 17, 2022, estimated cost $15K, described as “Filing herewith plans and application to remove non-bearing partition in the kitchen and dining room. Also finishing up the attic. No change in use, egress or occupancy.”
- Alteration, filed Aug 8, 2022, estimated cost $29K, described as “Filing herewith plans and application for 229-06 87 avenue to remove non-bearing partition on first floor, renovate existing kitchen and new concrete/brick pavers at rear. No change in use/egress or occupancy.”
- Alteration, filed Apr 13, 2022, estimated cost $11K, described as “Filing herewith plans and application for new 126 sqft wood balcony at rear of second floor. No change in use/egress or occupancy under this application.”
- Alteration, filed Nov 17, 2021, estimated cost $10K, described as “Filing herewith plans and application for 229-07 87TH avenue, 1 st floor to remove non-bearing partitions between kitchen and dining room. Renovate the existing kitchen. No change in use, egress, or occupancy.”
- Alteration, filed Jul 23, 2021, estimated cost $17K, described as “Filing herewith plans and application for new rear exit and brick/concrete steps with brick pavers patio. No change in use/egress or occupancy under this application.”
- Alteration, filed May 11, 2021, estimated cost $29K, described as “Filing herewith plans and application to remove non-bearing partition and renovate existing kitchen on 1ST floor, also provide new header for removal of bearing partition. No change in use/egress or occupancy under this application.”
- Alteration, filed Oct 15, 2020, estimated cost $27K, described as “Install new chimney liner in existing masonry chimney.”
- Alteration, filed Oct 2, 2020, described as “Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.”
- Alteration, filed Jun 23, 2020, estimated cost $3K, described as “Filing herewith plans and application for a new washer and direct replacement of kitchen sink and kitchen gas stove on the second floor of 229-01 87TH avenue. Construction filed under job #440600075. No change in use, egress, or occupancy.”
Property taxes
- Assessment
- $5,018,400
- 2026–27 Tax
- $400,747
- Market value (city estimate)
- $11,152,000
- Taxable value
- $4,280,797
- Assessed land
- $981,450
- Assessed improvements
- $4,036,950
Tax breaks
- Co-op and Condo Abatement, with no end date, a $135,671 credit this tax year.
Zoning
R3-2: floor area ratio 0.42 built, 0.75 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 14, 2026: $275,000
- Jun 16, 2026: $250,000
- Jun 15, 2026: $250,000
- Dec 10, 2025: $330,000
- Nov 18, 2025: $330,000
- Nov 17, 2025: $267,000
- Nov 10, 2025: $288,000
- Aug 21, 2025: $340,000
- Dec 4, 2024: $265,000
- Jul 26, 2024: $262,000
The 10 most recent of 77 open-market sales since 2016, from the Department of Finance’s sales files.