250-01 Northern Boulevard, Queens
Commercial · built 1970 · Block 8129, Lot 1.
Building permits
- Alteration, filed Jun 3, 2025, estimated cost $10K, described as “Filing plans herewith for the installation of sanitary piping. No change to use, egress, or occupancy.”
- Alteration, filed Jul 16, 2024, estimated cost $50K, described as “Filing herewith plans for the installation of a sign foundation. No change to use, egress, or occupancy.”
- Alteration, filed Jun 10, 2024, estimated cost $100K, described as “Filing herewith plans for the installation of new on-site inlets, conveyance piping, and underground retention system. No change to use, egress, or occupancy.”
- Alteration, filed Jul 5, 2023, estimated cost $15K, described as “Filing herewith plans for the installation of illuminated non-flashing signage. No change to use, egress, or occupancy.”
- Alteration, filed Dec 19, 2022, estimated cost $700K, described as “Filing plans herewith for renovations to an existing McDonalds restaurant. Application filed in-conjunction with ALT CO application Q08023028.”
- Alteration, filed Dec 7, 2022, estimated cost $40K, described as “Filing herewith foundation plans for the associated foundation work for an existing McDonalds restaurant. No change to use, egress, or occupancy.”
- Alteration, filed Dec 7, 2022, estimated cost $15K, described as “Filing herewith structural plans for the structural work related to the horizontal enlargement of an existing McDonalds restaurant. No change to use, egress, or occupancy.”
- Alteration, filed Nov 15, 2022, estimated cost $70K, described as “Filing plans herewith for the Plumbing related work to existing McDonalds restaurant. No change to use, egress, or occupancy.”
- Alteration, filed Nov 15, 2022, estimated cost $70K, described as “Filing plans herewith for the HVAC modification and associated ductwork in conjunction with ALT I.”
- Alteration, filed Nov 15, 2022, estimated cost $3K, described as “Filing plans herewith for the installation of a temporary construction fence. No change to use, egress, or occupancy.”
- Alteration, filed Oct 26, 2022, estimated cost $100K, described as “ALT CO plans filed herewith for Site Improvements. Filed in conjunction with application #Q08023849-I1”
- Alteration, filed Oct 12, 2021, estimated cost $17K, described as “Construction of a trash compactor enclosure.”
Building history
- Alteration, filed Jan 5, 2017, signed off Oct 5, 2021, described as “Filing alt-1 in conjunction with sub-division 421385735 to establish new metes and bounds. Also filing to obtain new place of assembly permit.”
- Alteration, filed Aug 27, 1997, plan exam - disapproved, described as “Propose to construct new accessible toil et facilities , storage areas a d second drive through window .see comme nts #16 . Proposed additional floor area 407”
New buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $1,377,900
- 2026–27 Tax
- $149,277
- Market value (city estimate)
- $3,062,000
- Taxable value
- $1,376,076
- Assessed land
- $926,100
- Assessed improvements
- $451,800
Zoning
R3-1 (part of the lot is R2A): floor area ratio 0.19 built, 0.75 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Change to an Earlier Grant (Board of Standards and Appeals 2019-16-BZII): Change to an Earlier Grant, Granted, filed Dec 8, 2022, decided Jul 10, 2023. Amendment of Special Permit under ZR Section 73-243 permitting a 583 square foot horizontal enlargement to eating & drinking establishment (McDonald's ) and to extend the term which expires on June 30, 2026 within an R3-1 /C1-2 Zoning…
- Variance or Special Permit (Board of Standards and Appeals 2019-16-BZ): Variance or Special Permit, Granted, filed Jan 22, 2019, decided Jun 30, 2021. Special Permit (§73-243) to permit an accessory drive-through to a proposed eating and drinking establishment (UG 6) (McDonald’s) contrary to ZR §32-15. C1-2/R3-1 and R2A zoning districts.