272-40 Grand Central Parkway, Queens
Co-op · 1,844 units · built 1972 · Block 8489, Lot 1.
Building permits
- Alteration, filed Sep 15, 2026, described as “Facade inspection & repairs.”
- Alteration, filed Sep 3, 2026, estimated cost $15K, described as “Concrete slab and railing post repairs to be conducted at select balcony. No change in use, egress or occupancy.”
- Alteration, filed Jul 1, 2026, estimated cost $158K, described as “Combination of apts 19O and 19P filed under tppn 3/97. No change to use, occupancy or egress.”
- Alteration, filed May 12, 2026, estimated cost $22K, described as “Parapet reconstruction to address emergency conditions at above grade plaza. No change to use, egress, or occupancy.”
- Alteration, filed Apr 22, 2026, estimated cost $325K, described as “Filing interior renovation application for apartment 12W/ 12Y on the 12TH floor, as per tppn #3/97; nochange to use, egress, occupancy”
- Alteration, filed Apr 7, 2026, estimated cost $400K, described as “Replacement of 4 cooling tower units”
- Alteration, filed Mar 20, 2026, estimated cost $50K, described as “Supplying temporary generator trailers with fuel gas to serve as primary power during scheduled maintenance on the existing main generators.”
- Alteration, filed Mar 20, 2026, estimated cost $500K, described as “This project involves supplying temporary generator trailers with fuel gas to serve as primary power during scheduled maintenance on the existing main generators. The scope of work includes installing a new medium-pressure gas connection…”
- Alteration, filed Oct 1, 2025, described as “Facade inspection”
- Alteration, filed Oct 1, 2025, described as “Facade inspection”
- Alteration, filed Oct 1, 2025, described as “Facacde inspection”
- Alteration, filed Sep 11, 2025, estimated cost $4K, described as “Combination of apartments 5O & 5P. Cap existing gas line. No change of use, egress or occupancy under this application.”
- Alteration, filed Sep 11, 2025, estimated cost $37K, described as “Combination of apartment 5O & 5P. Removal and Installation of partitions, new walls and floor finishes. No change of use, egress or occupancy under this application.”
- Alteration, filed Aug 12, 2025, estimated cost $27K, described as “Herewith filed to install a screen and aluminum balcony enclosure in apartments 10V, 16O, 17G, 23N, 24D, 26V, 14W, 7V & 18D. No change to use, egress occupancy or bulk.”
- Alteration, filed Aug 12, 2025, estimated cost $24K, described as “Herewith filed to install a screen and aluminum balcony enclosure in apartments 6O, 17N, 18D, 21W, 28L, 32D, 11D & 11V. No change to use, egress occupancy or bulk.”
- Alteration, filed Jul 22, 2025, described as “Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco”
- Alteration, filed Jul 22, 2025, described as “Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco”
- Alteration, filed Jul 22, 2025, described as “Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Brian Barco”
- Alteration, filed Mar 3, 2025, estimated cost $180K, described as “Combine two adjacent apartments into one., remove one kitchen, remove and construct non-bearing partitions, new finishes. Work to comply with TPPN 3/97 combining residential apartments without affecting the C of O. No change to use, egress…”
- Alteration, filed Dec 16, 2024, estimated cost $10K, described as “Interior renovation of existing apartment #21B in 21st floor with plumbing work as per plan; no change in use, egress or occupancy under this application.”
- Alteration, filed Dec 4, 2024, estimated cost $130K, described as “Interior renovation to apartment 18V in building 1 with minor partition work and finishes. No change to use, egress or occupancy.”
- Alteration, filed Nov 15, 2024, estimated cost $40K, described as “Interior renovation of existing apartment #21B in 21st floor with general construction: replace and update kitchen cabinet; no change in use,egress or occupancy under this application.”
- Alteration, filed Nov 6, 2024, estimated cost $3.7M, described as “Garage restoration. No change in use, egress or occupancy.”
- Alteration, filed Nov 6, 2024, estimated cost $85K, described as “Combination of apts 29EF filed in conjuntion with DOB now pl. No change to use, occupancy or egress.”
- Alteration, filed Oct 14, 2024, estimated cost $30K, described as “Herewith filed to install a screen and aluminum balcony enclosure in apartments 7D, 12H, 18W, 27V, 31O, 17D, 11L, 15O, 19D & 18V. No change to use, egress occupancy or bulk.”
18 more, older permits are in this building’s full list on the map.
Building history
- Alteration, filed Jul 19, 2023, permit issued - entire job/work
- Alteration, filed Sep 19, 2017, plan exam - approved, described as “At existing cellar and golfers lounge interior renovation including removal and installation of interior non-bearing partitions, plumbing fixtures and finishes as per plans filed herewith. All work on cellar level.”
- Alteration, filed Apr 19, 2017, plan exam - disapproved, described as “Expansion of golfers lounge, installation of new outdoor terrace and stairs. Interior partition changes. All work on cellar level”
- Alteration, filed Mar 6, 2012, permit issued - entire job/work
- Alteration, filed Mar 4, 2008, signed off Nov 7, 2012
- Alteration, filed Mar 4, 2008, permit issued - entire job/work
- Alteration, filed Mar 4, 2008, permit issued - entire job/work
- New Building, filed Mar 7, 2000, signed off Aug 4, 2006, 1 story
- Major Renovation — Conversion, filed Jan 5, 1999, plan exam - approved, 428 units added, 32 stories, described as “To increase the number of occupants in s ub-cellar. To remove a concr block wall approximatly 4'-9 x 8'-0”
- Alteration, filed Aug 21, 1992, permit issued - entire job/work, described as “Minor non bearing partitions and rerouti ng of an exit.”
The 10 most recent of 13 new buildings, demolitions and major alterations filed in the city’s older system since 1989.
Property taxes
- Assessment
- $168,303,600
- 2026–27 Tax
- $17,182,029
- Market value (city estimate)
- $374,008,000
- Taxable value
- $160,907,919
- Assessed land
- $114,164,100
- Assessed improvements
- $54,139,500
Tax breaks
- Co-op and Condo Abatement, with no end date, a $2,829,107 credit this tax year.
Zoning
R3-2: floor area ratio 0.89 built, above the 0.75 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Oct 27, 2026: $310,000
- Oct 15, 2026: $350,000
- Oct 15, 2026: $365,000
- Oct 9, 2026: $700,000
- Oct 8, 2026: $557,000
- Oct 2, 2026: $300,000
- Oct 1, 2026: $675,000
- Sep 30, 2026: $273,000
- Sep 29, 2026: $650,000
- Sep 25, 2026: $227,500
The 10 most recent of 1,328 open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Change to an Earlier Grant (Board of Standards and Appeals 826-86-BZVI): Change to an Earlier Grant, Granted, filed Apr 5, 2024, decided Jan 6, 2025. Extension of Term of the special permit (§73-30) permitting non-accessory radio towers and transmitting equipment on the roof of an existing thirty-three story building which expires on January 26, 2025. R3-2 zoning district.
- Change to an Earlier Grant (Board of Standards and Appeals 827-86-BZVI): Change to an Earlier Grant, Granted, filed Apr 5, 2024, decided Jan 6, 2025. Extension of Term of the special permit (§73-30) permitting non-accessory radio towers and transmitting equipment on the roof of an existing thirty-three story building which expires on January 26, 2025. R3-2 zoning district.
- Change to an Earlier Grant (Board of Standards and Appeals 828-86-BZVI): Change to an Earlier Grant, Granted, filed Apr 5, 2024, decided Jan 6, 2025. Extension of Term of the special permit (§73-30) permitting non-accessory radio towers and transmitting equipment on the roof of an existing thirty-three story building which expires on January 26, 2025. R3-2 zoning district.
- Change to an Earlier Grant (Board of Standards and Appeals 826-86-BZV): Change to an Earlier Grant, Granted, filed Dec 22, 2014, decided Sep 13, 2016. Extension of Term of the special permit (§73-11) permitting non-accessory radio towers and transmitting equipment on the roof of an existing thirty-three story building which expired on January 26, 2015. R3-2 zoning district.
- Change to an Earlier Grant (Board of Standards and Appeals 827-86-BZV): Change to an Earlier Grant, Granted, filed Dec 22, 2014, decided Sep 13, 2016. Extension of Term of the special permit (§73-30) permitting non-accessory radio towers and transmitting equipment on the roof of an existing thirty-three story building which expired on January 26, 2015. R3-2zoning district.
- Change to an Earlier Grant (Board of Standards and Appeals 828-86-BZV): Change to an Earlier Grant, Granted, filed Dec 22, 2014, decided Sep 13, 2016. Extension of Term of Special Permit (§73-11) permitting non-accessory radio towers and transmitting equipment on the roof of an existing thirty-three story building which expired on January 26, 2015. R3-2 zoning district.
- Change to an Earlier Grant (Board of Standards and Appeals 826-86-BZIV): Change to an Earlier Grant, Granted, filed Aug 26, 2010, decided Oct 26, 2010. Extension of Time to obtain a Certificate of Occupancy which expired on July 26, 2010 for a Special Permit (§73-11) to allow non-accessory radio towers and transmitting equipment on the roof of a 33-story multiple dwelling (North Shore…
- Change to an Earlier Grant (Board of Standards and Appeals 827-86-BZIV): Change to an Earlier Grant, Granted, filed Aug 26, 2010, decided Oct 26, 2010. Extension of Time to obtain a Certificate of Occupancy which expired on July 26, 2010 for a Special Permit (§73-11) to allow non-accessory radio towers and transmitting equipment on the roof of a 33-story multiple dwelling (North Shore…
- Change to an Earlier Grant (Board of Standards and Appeals 828-86-BZIV): Change to an Earlier Grant, Granted, filed Aug 26, 2010, decided Oct 26, 2010. Extension of Time to obtain a Certificate of Occupancy which expired on July 26, 2010 for a Special Permit (§73-11) to allow non-accessory radio towers and transmitting equipment on the roof of a 33-story multiple dwelling (North Shore…
- Change to an Earlier Grant (Board of Standards and Appeals 826-86-BZIII): Change to an Earlier Grant, Granted, filed Apr 3, 2009, decided Jan 26, 2010. Extension of Term for a Special Permit (§73-11) to allow non-accessory radio towers and transmitting equipment on the roof of a 33-story multiple dwelling (North Shore Towers) which expired on March 28, 2008; Extension of Time to obtain a…