76-35 Commonwealth Boulevard, Queens
Co-op · 168 units · built 1947 · Block 8492, Lot 2.
Building permits
- Alteration, filed Jul 9, 2025, estimated cost $40K, described as “Filing herewith plans and applicatoin for a new 198 sqft open balcony at rear of second floor. No change in use, egress or occupancy.”
- Alteration, filed Jul 25, 2024, estimated cost $14K, described as “Filing herewith plans and application for a new 99 sqft concrete and brick porch in the front yard of the first floor. No change in use, egress, or occupany.”
- Alteration, filed May 14, 2024, estimated cost $25K, described as “Application herewith filed to erect a deck at rear of 2ndf floor apartment. No change to use, egress or occupancy.”
- Alteration, filed May 15, 2023, estimated cost $25K, described as “Install new direct vents as per plans. No change in use, occupancy, or egress.”
- Alteration, filed May 15, 2023, estimated cost $25K, described as “Install new direct vents as per plans. No change in use, occupancy, or egress.”
- Alteration, filed May 15, 2023, estimated cost $5K, described as “Connect replacement gas piping to existing gas piping, install new hot water storage tanks as per plans. No change in use, occupancy, or egress.”
- Alteration, filed May 15, 2023, estimated cost $100K, described as “Install (4) new gas-fired boilers as per plans. No change in use, occupancy, or egress.”
- Alteration, filed May 15, 2023, estimated cost $5K, described as “Install replacement gas piping as per plans. No change in use, occupancy, or egress.”
- Alteration, filed May 15, 2023, estimated cost $25K, described as “Install new gas-fired boiler as per plans. No change in use, occupancy or egress.”
- Alteration, filed May 15, 2023, estimated cost $10K, described as “Remove fuel oil storage tank as per plans. No change in use, occupancy, or egress.”
- Alteration, filed May 15, 2023, estimated cost $10K, described as “Remove fuel oil storage tank as per plans. No change in use, occupancy, or egress.”
- Alteration, filed Jul 6, 2022, estimated cost $200K, described as “Interior renovation of apartment and installing new deck. No change in use, egress or occupancy”
- Alteration, filed Apr 8, 2022, estimated cost $2K, described as “Herewith filing to install pipes and drain for washer and dryer”
- Alteration, filed Feb 23, 2022, estimated cost $20K, described as “New rear wood balcony (16'-2" x 12'-4") in open space. No change in use, egress or occupancy.”
- Alteration, filed Oct 27, 2021, estimated cost $13K, described as “Filing herewith plans and application for new 128 sqft wood balcony at front of second floor. No change in use/egress or occupancy.”
- Alteration, filed Oct 4, 2021, estimated cost $17K, described as “Repair existing left half of damaged wood deck in rear yard. Existing right half of deck to remain. No change in use, egress or occupancy.”
- Alteration, filed Sep 9, 2021, estimated cost $20K, described as “Installation of new private entrance door for second floor apartment unit. No change in use, egress or occupancy.”
Property taxes
- Assessment
- $8,165,700
- 2026–27 tax
- $828,619
- Market value (city estimate)
- $18,146,000
- Taxable value
- $7,140,211
- Assessed land
- $2,502,900
- Assessed improvements
- $5,662,800
Tax breaks
- J-51 abatement, through Dec 31, 2045, a $64,611 credit this tax year.
Zoning
R3-2: floor area ratio 0.48 built, 0.75 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Apr 28, 2026: $279,900
- Mar 13, 2026: $360,000
- Feb 27, 2026: $250,000
- Nov 18, 2025: $252,000
- Jul 30, 2025: $370,000
- Jan 31, 2025: $290,000
- Sep 6, 2024: $350,000
- Jul 2, 2024: $392,000
- Jan 23, 2024: $299,900
- Nov 2, 2023: $272,000
The 10 most recent of 58 open-market sales since 2016, from the Department of Finance’s sales files.