255-03 Union Turnpike, Queens
Commercial · built 1948 · Block 8513, Lot 2.
Building permits
- Alteration, filed Oct 30, 2026, estimated cost $285K, described as “Interior renovation to include demolition of existing and construction of new partitions. no change in use, egress, or occupancy.”
- Alteration, filed Sep 4, 2026, estimated cost $11K, described as “Erect accessory business wall sign for planet fitness. No change in use, egress, or occupancy.”
- Alteration, filed Sep 4, 2026, estimated cost $6K, described as “Erect accessory business wall sign for planet fitness. No change in use, egress or occupancy.”
- Alteration, filed Aug 27, 2026, estimated cost $851K, described as “General construction work for Interior renovation to include demolition of existing and construction of new partitions. No change in use, egress or occupancy.”
- Alteration, filed Jul 9, 2026, estimated cost $1.0M, described as “Proposed tenant layout only. Work to include new interior partitions, finishes and fixtures for a new fitness center. Electrical, plumbing, mechanical, sprinkler, sign, and structural to be filed separate. No change to occupancy use or…”
- Alteration, filed Dec 12, 2025, estimated cost $177K, described as “Mechanical modifications to include HVAC installation and associated ductwork and piping. No change to use, occupancy or egress”
- Alteration, filed Dec 2, 2025, estimated cost $50K, described as “Rooftop ac unit replacement. No change in use, egress or occupancy.”
- Alteration, filed Oct 17, 2025, estimated cost $4K, described as “Illuminated non-advertising accessory wall sign - in property lines - burlington. No change of use, egress or occupancy.”
- Alteration, filed Oct 17, 2025, estimated cost $4K, described as “Illuminated non-advertising accessory wall sign - in property lines - burlington. No change of use, egress or occupancy.”
- Alteration, filed Aug 12, 2025, estimated cost $116K, described as “Remove existing partitions, ceilings, lighting and finishes. Construct new partitions to demise the space. Install new ceilings and lighting. Construct new handicap accessible bathrooms.”
- Alteration, filed May 19, 2025, estimated cost $1K, described as “Propose to install non-advertising sign. No change in use, egress, or occupancy.”
- Alteration, filed May 19, 2025, estimated cost $1K, described as “Propose to install non-advertising sign. No change in use, egress, or occupancy.”
- Alteration, filed Apr 25, 2025, estimated cost $5K, described as “Erect illuminated accessory business sign on wall reading "t-mobile auhtorized retailer".”
- Alteration, filed Apr 25, 2025, estimated cost $5K, described as “Erect illuminated accessory business sign on wall reading "t-mobile auhtorized retailer".”
- Alteration, filed Jan 7, 2025, estimated cost $20K, described as “Radon mitigation system”
- Alteration, filed Nov 18, 2024, estimated cost $5K, described as “Direct replacement of RTU. Plumbing under subsequent filing”
- Alteration, filed Sep 29, 2024, estimated cost $3K, described as “Installation of an illuminated business accessory sign . No change in use, egress or occupancy”
- Alteration, filed Sep 29, 2024, estimated cost $3K, described as “Installation of an illuminated business accessory sign . No change in use, egress or occupancy”
- Alteration, filed Sep 29, 2024, estimated cost $3K, described as “Installation of an illuminated business accessory sign . No change in use, egress or occupancy”
- Alteration, filed Aug 27, 2024, estimated cost $15K, described as “Direct replacement of one (1) existing rooftop AC unit as per plans. No change in use, egress or occupancy is proposed under this application.”
- Alteration, filed Jul 25, 2024, estimated cost $550, described as “Illuminated non-advertising accessory wall sign - in property lines - rose valley cakes. No change of use, egress or occupancy.”
- Alteration, filed May 3, 2024, estimated cost $45K, described as “Installation of heat and air conditioning units and fans with duct works.”
- Alteration, filed May 3, 2024, estimated cost $130K, described as “Installation of new supply domestic water, sanitary & vent piping and all related appurtenances to new plumbing fixtures & equipment. And installation and modification of wet sprinkler system.”
- Alteration, filed Apr 29, 2024, estimated cost $3K, described as “Install a new illuminated sign read: unomexican grill as per plan. No change in use. Egress, and occupancy.”
- Alteration, filed Apr 17, 2024, estimated cost $13K, described as “Erect illuminated non advertising sign on wall. No change of use, egress or occupancy”
54 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $25,094,250
- 2026–27 tax
- $2,479,433
- Market value (city estimate)
- $55,765,000
- Taxable value
- $22,856,130
- Assessed land
- $10,567,350
- Assessed improvements
- $14,526,900
Zoning
C4-1 (part of the lot is R3-2): floor area ratio 0.53 built, 1.50 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Board and land use applications
- Variance or special permit (Board of Standards and Appeals 2019-156-BZ): Variance or special permit, Granted, filed May 23, 2019, decided Dec 10, 2019. Special Permit (§73-36) to permit the operation of a Physical Cultural Establishment (Goldfish Swim School) to be located within an existing retail space located within an existing shopping center contrary to ZR §32-10. C4-1 zoning…