132-43 Metropolitan Avenue, Queens
Condominium · 33 units · built 2022 · Block 9285, Lot 7501.
Building permits
- Alteration, filed Nov 12, 2024, estimated cost $776K, described as “Medisys health network surgical and orthopedic ambulatory care center. Demo exist non-bearing interior partitions, construct new non-bearing interior partitions, suspended ceiling, and finishes as per plans submitted.”
- Alteration, filed Nov 11, 2024, estimated cost $157K, described as “Medisys health network surgical & orthopedic ambulatory care center. Modifications to existing wet sprinkler system- new sprinkler heads, piping,, etc. As per plans submitted.”
- Alteration, filed Nov 11, 2024, estimated cost $96K, described as “Medisys health network surgical and orthopedic ambulatory care center. Installation of air conditioning system as per plan submitted.”
- Alteration, filed Nov 11, 2024, estimated cost $158K, described as “Medisys health network surgical & orthopedic ambulatory care center. Plumbing system installation- fixtures, cold water service piping, hot water circulating piping, instrumentation, etc. As per plans submitted.”
- Alteration, filed Oct 14, 2023, estimated cost $2K, described as “Installation of a new curb cut in conjunction with a new building #421133008”
- Alteration, filed Feb 1, 2023, estimated cost $1K, described as “Installation of temporary needle beam as per plans. No change in use, egress or occupancy shall comply with CHAPTER#33 of 2022 the NYC building code.”
- Alteration, filed Feb 1, 2023, estimated cost $1K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of 2022 the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Dec 2, 2022, estimated cost $2K, described as “Use of a small crane during construction”
- Alteration, filed Nov 8, 2022, estimated cost $5K, described as “Installation of the Wet Standpipe System with sprinkler take-off”
- Alteration, filed Oct 27, 2022, estimated cost $1K, described as “Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of the NYC building code. Live load 300PSF.”
- Alteration, filed Aug 5, 2021, estimated cost $5K, described as “Structural work in conjunction with NB #421133008”
- Alteration, filed May 16, 2021, estimated cost $5K, described as “Foundation and Earth work in conjunction with NB #421133008”
- Alteration, filed Apr 4, 2021, estimated cost $5K, described as “Plumbing work in conjunction with NB #421133008”
- Alteration, filed Apr 4, 2021, estimated cost $5K, described as “Mechanical work in conjunction with NB #421133008”
- Alteration, filed Jun 9, 2020, estimated cost $5K, described as “Installation of the construction fence”
Property taxes
- Assessment
- $3,224,709
- 2026–27 tax
- $255,180
- Market value (city estimate)
- $7,166,001
- Taxable value
- $3,043,279
- Assessed land
- $202,505
- Assessed improvements
- $3,022,204
- Condo units with their own tax lots
- 34
Tax breaks
- Co-op and condo abatement, with no end date, a $40,044 credit this tax year.
Zoning
R6: floor area ratio 3.76 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jul 1, 2025: $610,950, Apt 7F
- Jun 23, 2025: $349,830, Apt 7B
- Jan 27, 2025: $605,859, Apt 4F
- Jan 22, 2025: $641,498, Apt 8A
- Jan 6, 2025: $645,348, Apt 7A
- Dec 4, 2024: $541,709, Apt 5F
- Nov 21, 2024: $722,958, Apt 3A
- Nov 19, 2024: $2,388,481, Apt C1
- Nov 19, 2024: $436,020, Apt 4B
- Nov 8, 2024: $568,184, Apt 3E
The 10 most recent of 33 open-market sales since 2016, from the Department of Finance’s sales files.
In the news
Permits Filed for 132-47 Metropolitan Avenue in Kew Gardens, Queens, New York YIMBY, Jul 10, 2020.