113-02 89th Avenue, Queens
Public School · built c. 1931 · Block 9321, Lot 1.
Building permits
- Alteration, filed Nov 4, 2026, estimated cost $25K, described as “Filing for temporary debris chute. No change in use, egress or occupancy.”
- Alteration, filed Nov 3, 2026, estimated cost $80K, described as “Filing for temporary support of excavation in conjunction wtih Q01254779. No change in use, egress or occupancy.”
- Alteration, filed Oct 25, 2026, estimated cost $40K, described as “Filing for temporary construction fence in conjunction wtih Q01254779. No change in use, egress or occupancy.”
- Alteration, filed Oct 25, 2026, estimated cost $60K, described as “Filing for supported scaffolding in conjunction wtih Q01254779. No change in use, egress or occupancy.”
- Alteration, filed Oct 25, 2026, estimated cost $50K, described as “Filing for sidewalk shed in conjunction with Q01254779. No change in use, egress or occupancy.”
- Alteration, filed Aug 19, 2025, estimated cost $10K, described as “Installation of temporary fence for NYCDEP Contract # GI-CONS-3”
- Alteration, filed Aug 5, 2025, estimated cost $7.3M, described as “Q475_Facade repair work, window system upgrade, structural stabilization work, roof replacement, and parapet reconstruction.”
- Alteration, filed Feb 21, 2025, estimated cost $2.2M, described as “Interior renovation of classrooms to upgrade existing culinary arts classrooms.”
- Alteration, filed Feb 13, 2025, estimated cost $1.1M, described as “Interior renovation of basement classrooms for new robotics lab renovation of existing single occupancy restroom in the basement to an accessible restroom”
- Alteration, filed Feb 13, 2025, estimated cost $535K, described as “Interior renovation of classrooms to upgrade existing media center. Accessible upgrades to the first floor building entrance, installation of a wheelchair lift on existing interior stair.”
- Alteration, filed Mar 28, 2024, estimated cost $480K, described as “The scope of work includes the installation of the supplemental cooling systems for the basement cafeteria.”
- Alteration, filed Apr 7, 2023, estimated cost $1.4M, described as “Roof playground slab replacement and architectural, mechanical, plumbing, and electrical associated work.”
- Alteration, filed Sep 29, 2022, estimated cost $342K, described as “Renovate existing library in room 404 - add new interior non-structural glazed partition - no change in use - no change in occupancy - no change in egress - no change in ventilation”
- Alteration, filed Sep 28, 2022, estimated cost $15K, described as “Supported Scaffold at Richmond Hill HS Courtyard”
- Alteration, filed Sep 28, 2022, estimated cost $25K, described as “SOE for weatherproofing existing building foundation.”
- Alteration, filed Aug 22, 2022, estimated cost $15K, described as “Richmond hill hs: proposed construction fence for modifications to an existing school building. Fence filed in conjunction with DOB applications Q00699936, 421902285, 421902640 and all related applications.”
- Alteration, filed Mar 18, 2022, estimated cost $10.0M, described as “Remove 3 existing oil fired boilers and replace with 3 new gas fired boilers with boiler feed and other associated parts .”
- Alteration, filed Mar 11, 2022, estimated cost $1.5M, described as “Retrofit existing schoolyards to include green infrastructure (gi) that will manage stormwater runoff from the tributary impervious surfaces. The work is part of NYC's gi program with the primary goal to reduce combined sewer overflows…”
- Alteration, filed Sep 27, 2021, estimated cost $5K, described as “Filing for installation of sidewalk shed on behalf of contractor”
Property taxes
- Assessment
- $11,115,000
- Market value (city estimate)
- $24,700,000
- Taxable value
- $0
- Assessed land
- $1,763,550
- Assessed improvements
- $9,351,450
Zoning
R4A: floor area ratio 0.86 built, 1.00 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.