89-10 Van Wyck Expressway, Queens
Hospital · built 1987 · Block 9364, Lot 10.
Building permits
- Alteration, filed Sep 14, 2026, estimated cost $1K, described as “Installation of plywood construction fence in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Jun 12, 2026, estimated cost $750K, described as “Filing for installation of new emergency generator fuel oil pump package and associated piping and controls, in conjunction with mechanical application DOB NOW #: Q01121837-I1.”
- Alteration, filed May 29, 2026, estimated cost $837K, described as “Jamaica hospital urgent care center. Work includes demo of exist non-bearing interior partitions, construction of new non-bearing interior partitions, suspended ceiling, and finishes to create an outpatient clinic.”
- Alteration, filed May 29, 2026, estimated cost $939K, described as “Jamaica hospital emergency triage suite. Work includes demolition of existing non-bearing interior partitions, construction of new non-bearing interior partitions, suspended ceiling, and finishes to create an outpatient clinic.”
- Alteration, filed Mar 26, 2026, estimated cost $1.1M, described as “Renovation of jamaica hospital medical center 1ST flr radiology dept. To create pet scan & ultrasound suites. Work includes removal & installation of non-load-bearing partitions, suspended ceiling, 0FINISHES, millwork. No change of use,…”
- Alteration, filed Mar 11, 2026, estimated cost $30K, described as “The work depicted here is for the plumbing filing for Jamaica Hospital Medical Center. this work includes the relocation of an existing manhole.”
- Alteration, filed Mar 11, 2026, estimated cost $46K, described as “Replacement of pavement in side yard in conjunction with Generator Restoration project”
- Alteration, filed Feb 27, 2026, estimated cost $20K, described as “Earthwork in conjunction with Generator restoration”
- Alteration, filed Oct 28, 2025, estimated cost $1.8M, described as “Construction of a linear accelerator suite and associated support spaces in cellar and basement of building a and building b.”
- Alteration, filed Sep 17, 2025, estimated cost $700K, described as “Structural work in conjunction with Alteration 2 application Q01121837”
- Alteration, filed Aug 20, 2025, estimated cost $30K, described as “Temporary supported scaffold as per drawings. Scaffold shall comply with ch #33OF the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 28, 2025, described as “Temporary suspended scaffold as per drawings during bldg alteration, filed sep. Suspended scaffold shall comply with ch 33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 28, 2025, estimated cost $2K, described as “Temporary supported scaffold as per drawings. Scaffold shall comply with ch #33OF the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jan 23, 2025, estimated cost $1K, described as “Installation of sidewalk shed in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Jan 3, 2025, estimated cost $350K, described as “Abandon existing generator belly day tank and replace with new aboveground fuel storage day tank.”
- Alteration, filed Dec 18, 2024, estimated cost $1K, described as “Installation of roof protection for adjacent property protection during construction. Roof protection shall comply with 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Dec 18, 2024, estimated cost $1K, described as “Installation of sidewalk shed in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Oct 29, 2024, estimated cost $1.7M, described as “Addition of an entrance, demolition of existing non-bearing interior partitions, construction of new non-bearing interior partitions, suspended ceiling & finishes to renovate emergency department, ST. mech. vent, air conditioning, pl, sp,…”
- Alteration, filed Oct 25, 2024, estimated cost $21K, described as “Replacement split HVAC system with total capacity of 6 tons. No change to egress, use, or occupancy.”
- Alteration, filed Oct 4, 2024, estimated cost $2.5M, described as “Installation of new 2.5MW emergency diesel generator.”
- Alteration, filed Oct 1, 2024, estimated cost $1K, described as “Installation of construction fence in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed Oct 1, 2024, estimated cost $1K, described as “Installation of plywood construction fence in accordance with nycc 2022 chapter 33 building code. No change in egress, use, or occupancy.”
- Alteration, filed May 1, 2024, estimated cost $350K, described as “Filing plans for proposed support of excavation, slide rail system,”
- Alteration, filed Apr 15, 2024, estimated cost $15K, described as “Construction fence for protection of public. No change in use, egress, or occupancy”
- Alteration, filed Jan 16, 2024, estimated cost $32K, described as “Installation and legalization of one (1) temporary fuel oil storage tank to supply emergency generator.”
42 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $80,186,400
- Market value (city estimate)
- $178,192,000
- Taxable value
- $0
- Assessed land
- $1,946,700
- Assessed improvements
- $78,239,700
Tax breaks
- Nonprofit exemption (hospital), with no end date, about $8,698,621 a year below the full tax.
Zoning
R6: floor area ratio 4.92 built, above the 2.43 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.