# 104-06 101st Avenue, Queens

Parochial School · built 1960 · Block 9422, Lot 1.

On Umarelli: https://umarelli.org/nyc/4094220001/104-06-101-avenue

More construction in Richmond Hill: https://umarelli.org/nyc/queens/richmond-hill.md

Every lot on block 9422: https://umarelli.org/nyc/queens/9422.md

## Building permits

- Alteration, filed Oct 11, 2023, estimated cost $30K, described as “Install kitchen exhaust & MUA system for existing 1st floor kitchen”
- Alteration, filed Sep 19, 2023, estimated cost $10K, described as “Installation of construction fence for public protection during construction work”
- Alteration, filed May 1, 2023, estimated cost $35K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 25, 2023, estimated cost $1.6M, described as “Facade repairwork as per plans filed herewith. no change to use, egress or occupancy.”
- Alteration, filed Apr 14, 2023, estimated cost $36K, described as “Install new chimney liner in existing masonry chimney.”
- Alteration, filed Apr 14, 2023, estimated cost $25K, described as “Replace gas piping to (2) gas burners.”
- Alteration, filed Apr 14, 2023, estimated cost $255K, described as “Replace (2) boilers and (2) gas burners.”
- Alteration, filed Mar 16, 2023, estimated cost $25K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Oct 25, 2022, estimated cost $2.7M, described as “PS 509Q. Renovation of the existing school building. Selective replacement of doors, ceilings, and finishes. New partitions at selected locations.”
- Alteration, filed Apr 25, 2022, estimated cost $2K, described as “Reconnect two (2) replacement boilers to gas line and register hot water heater. No change in use, egress or occupancy.”
- Alteration, filed Apr 25, 2022, estimated cost $76K, described as “Replace two (2) boilers. No change in use, egress or occupancy.”
- Alteration, filed Apr 14, 2022, estimated cost $37K, described as “Install chimney liner.”

## Property taxes

- Assessment: $6,071,850
- Market value (city estimate): $13,493,000
- Taxable value: $0
- Assessed land: $1,085,400
- Assessed improvements: $4,986,450

## Tax breaks

- Nonprofit exemption (religious school), with no end date, about $658,674 a year below the full tax.

## Zoning

R4-1 (part of the lot is R6B): floor area ratio 0.20 built, 1.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
