# 90-36 149th Street, Queens

Apartment building · 112 units · built 1941 · Block 9678, Lot 112.

On Umarelli: https://umarelli.org/nyc/4096780112/90-36-149-street

More construction in Jamaica: https://umarelli.org/nyc/queens/jamaica.md

Every lot on block 9678: https://umarelli.org/nyc/queens/9678.md

## Building permits

- Alteration, filed Oct 18, 2026, described as “Ira for the vertical cable tray location inspection”
- Alteration, filed Oct 3, 2022, estimated cost $20K, described as “Replacement of existing antennas; installation of new DC2 on the rooftop (AT&T - 10097411) as per plans. All work is in compliance with TPPN 5/98 & BB 11/21. No change to use, egress or occupancy.”
- Alteration, filed Mar 25, 2021, estimated cost $274K, described as “Parapet wall replacement and spot pointing as per plan. No change in use, egress or occupancy with this application”
- Alteration, filed Mar 3, 2021, estimated cost $30K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code”
- Alteration, filed Nov 13, 2019, estimated cost $11K, described as “AT&T / Replacement of existing telecommunication antenna with replacement of RRH units on roof. Retrofit of cabinet in the existing equipment room in basement. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.”
- Alteration, filed Nov 11, 2019, estimated cost $5K, described as “Modification to existing at&t site. Install (3) ion-M23 sdars (rrh) with related equipment on roof and existing equipment room in cellar. All in conformance with tppn 5/98. No change in use, egress, or occupancy.”
- Alteration, filed Jan 14, 2019, estimated cost $5K, described as “Alteration type 3 - construction equipment - scaffold proposed installation of pipe scaffold for remedial repairs as per plans. No change in use occupancy or egress under this application.”
- Alteration, filed Feb 20, 2018, estimated cost $12K, described as “Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use occupancy or egress under this application. Live load 300 per square feet. Sidewalk shed shall comply with chapter # 33 of the 2014 code”
- Alteration, filed Jan 18, 2018, estimated cost $14K, described as “Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Retrofit of existing cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy,…”

## Property taxes

- Assessment: $4,032,000
- 2026–27 tax: $501,540
- Market value (city estimate): $8,960,000
- Taxable value: $4,032,000
- Assessed land: $640,800
- Assessed improvements: $3,391,200

## Zoning

R7X: floor area ratio 3.88 built, 5.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Board and land use applications

- Jamaica Neighborhood Plan (City Planning 2023Q0381): Zoning map change, Zoning text change, Urban development action area, Completed, filed Mar 14, 2025, decided Oct 29, 2025. In coordination with its agency partners, DCP is leading a neighborhood study in Jamaica that focuses on areas within and surrounding the Special Downtown Jamaica District. This study seeks to increase the supply of permanently affordable…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
