89-25 162nd Street, Queens
Apartment building · 89 units · built 2025 · Block 9761, Lot 30.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- New Building — Mid-Rise, filed Apr 21, 2022, estimated cost $16.7M, 126 units, 14 stories, described as “Proposed 14-story residential new building”
- Alteration, filed Aug 18, 2025, estimated cost $25K, described as “Installation of temporary needle beam as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Aug 12, 2025, estimated cost $11K, described as “Installation of temporary roof protection as per plans. No change in use, egress or occupancy. Shall comply with CHAPTER#33 of 2022 NYC building code.”
- Alteration, filed Aug 12, 2025, estimated cost $10K, described as “Equipment use: single 6000 # capacity personnel hoist during NB const, filed sep. Hoist shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elevator application submitted separately”
- Alteration, filed Aug 6, 2025, estimated cost $85K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jul 11, 2025, estimated cost $5K, described as “Underground Plumbing Work Type filed in conjunction with NB #Q00721898-I1”
- Alteration, filed Jun 27, 2025, estimated cost $25K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jun 10, 2025, estimated cost $3K, described as “Plumbing Work Type filed in conjunction with NB#Q00721898-I1”
- Alteration, filed May 23, 2025, estimated cost $50K, described as “SOE filed in conjunction with NB GC #Q00721898-I1”
- Alteration, filed Feb 10, 2025, estimated cost $2K, described as “Proposed construction fence filed for this new building gc # Q00721898-I1”
- Alteration, filed Sep 6, 2023, estimated cost $1K, described as “Propose a 12 feet curb cut (include two 1'-6" splays) in conjunction with NB#Q00721898-I1.”
- Alteration, filed Aug 3, 2023, estimated cost $2K, described as “Installation and use of construction fence as per plans submitted. Construction fence shall comply with chapter #33 of NYC building code. This application involves no change in occupancy, use or egress.”
- Demolition, filed Jun 23, 2023, estimated cost $10K, described as “Demolition of 1 story 2 car garage”
- No Work, filed Jul 24, 2022, described as “Church gospel convention with temporary tent”
Property taxes
- Assessment
- $3,518,100
- 2026–27 tax
- $430,373
- Assessed land
- $377,100
- Assessed improvements
- $3,141,000
Zoning
C4-4D: floor area ratio 6.26 built, above the 6.02 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
In the news
Housing Lottery Launches for Jamaica Central at 89-25 162nd Street in Jamaica, Queens, New York YIMBY, Jul 16, 2026.