# 87-41 Parsons Boulevard, Queens

Public school · built 1971 · Block 9774, Lot 1.

On Umarelli: https://umarelli.org/nyc/4097740001/87-41-parsons-boulevard

Every lot on block 9774: https://umarelli.org/nyc/queens/9774.md

## Building permits

- Alteration, filed Sep 17, 2026, estimated cost $700K, described as “This project consists of combining existing Rooms 201 and 203 into a new multipurpose activity space.”
- Alteration, filed Sep 15, 2026, estimated cost $40K, described as “Installation of temporary construction shoring for excavation in conjunction with job # Q01263129, Q01422165 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Aug 15, 2026, estimated cost $10K, described as “Installation of temporary construction fence for ps 86Q at 87-41 parsons boulevard, queens in conjunction with alt# Q01263129, Q01422166, Q01422170 as indicated on plans. There will be no change in the use, egress, or occupancy under this…”
- Alteration, filed Aug 15, 2026, estimated cost $10K, described as “Installation of new sidewalk shed for ps 86Q at 87-41 parsons boulevard, queens in conjunction with alt# Q01263129, Q01422165, Q01422170 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Aug 15, 2026, estimated cost $10K, described as “Installation of pipe scaffold for ps 86Q at 87-41 parsons boulevard, queens in conjunction with alt# Q01263129, Q01422165, Q01422166 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jul 4, 2026, estimated cost $20K, described as “Filing for sidewalk shed. No change in use, egress or occupancy. Filing in conjunction with Q01318076 and Q01269447”
- Alteration, filed Jul 4, 2026, estimated cost $60K, described as “Filing for temporary support of excavation in conjunction with main job no: Q01151906 and fence job no: Q01422952. No change in use, egress or occupancy.”
- Alteration, filed Jul 4, 2026, estimated cost $40K, described as “Filing for temporary construction fence. No change in use, egress or occupancy. Q01318076, Q01151906 and Q01269447”
- Alteration, filed Nov 14, 2025, estimated cost $60K, described as “Replacement of finishes, firestopping elements, concrete pads, and steel support elements in conjunction with mechanical scope of work”
- Alteration, filed Aug 18, 2025, estimated cost $1.4M, described as “Filing for the interior renovation of classroom #360 on the third floor. No change to use, egress or occupancy.”
- Alteration, filed Aug 5, 2025, estimated cost $3.5M, described as “Removal and replacement of exterior asphalt, parapets, roofing areas, masonry, and flood damage repair.”
- Alteration, filed Dec 20, 2024, estimated cost $2.6M, described as “Provide erosion & sediment control measures. Repair/repaint iron fence on ex. perimeter wall. Remove site fence & concrete curb at field & install new. Remove selected asphalt & concrete pavement & install new. New syn. turf…”
- Alteration, filed Jun 14, 2024, estimated cost $20K, described as “Installation of temporary construction fence at 160-05 highland avenue, queens as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jun 15, 2023, estimated cost $84K, described as “Removal of finishes to accommodate removal & installation of (2) new walk-in freezers & finishes at 3F & 4F existing kitchens in existing locations & installation of new condensers at roof above, roof patching & re-flashing at equipment…”
- Alteration, filed Jun 15, 2023, estimated cost $45K, described as “Filing for support of excavation. No change in use, egress or occupancy.”
- Alteration, filed Apr 5, 2023, estimated cost $20K, described as “Installation of temporary construction fence for hs 505Q at 160-05 highland avenue, queens as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Jan 23, 2023, estimated cost $2K, described as “Herewith filing for a Post Approval Amendment”
- Alteration, filed Oct 18, 2022, estimated cost $332K, described as “CTF Room Conversion 458, 460 and 462 involves demolition, removal of F/E , flooring, painting these spaces will be combined. New VCT flooring w/base walls and ceiling replaced and painted new SCA Furniture and equipment installed.”
- Alteration, filed May 20, 2022, estimated cost $1.2M, described as “Remove, replace conc. pavement, replace brick pavers with concrete, grate and mounting with galv. steel grating, deteriorated brick stairs with concrete stairs, install handrails, repair chain link and iron fences, rebuild retaining walls.”

## Property taxes

- Assessment: $41,468,400
- Market value (city estimate): $92,152,000
- Taxable value: $0
- Assessed land: $5,453,100
- Assessed improvements: $36,015,300

## Zoning

R5: floor area ratio 1.59 built, above the 1.50 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology
