# 167-01 Gothic Drive, Queens

Public school · built c. 1925 · Block 9858, Lot 100.

On Umarelli: https://umarelli.org/nyc/4098580100/167-01-gothic-drive

Every lot on block 9858: https://umarelli.org/nyc/queens/9858.md

## Building permits

- Alteration, filed Nov 2, 2026, estimated cost $50K, described as “Installation of Temporary Construction Fence to protect public in conjunction with Job # Q01053036”
- Alteration, filed Jul 8, 2026, estimated cost $20K, described as “Support of excavation to replace areaway drains and waterproof below areaway slabs in conjunction with DOB jobs Q01053036. No change in use, occupancy, or egress under this application.”
- Alteration, filed May 1, 2026, estimated cost $540K, described as “The scope of work includes all labor, materials, and equipment necessary to complete installation of air handling unit heating and cooling system in cellar Boiler room and first floor Auditorium.”
- Alteration, filed Aug 17, 2025, estimated cost $200K, described as “Support of Excavation”
- Alteration, filed Jul 8, 2025, estimated cost $10K, described as “Temporary Construction Fence Installation”
- Alteration, filed May 20, 2024, estimated cost $1.0M, described as “Remove and replace existikng area way slabs and area way walls. Interior plaster repair at basement.”
- Alteration, filed Feb 8, 2023, estimated cost $803K, described as “The proposed work will manage stormwater runoff on the property through the use of an underground storage system located in the grassed area.”
- Alteration, filed Nov 7, 2022, estimated cost $159K, described as “Q470\_Remove exist. science demonstration tables and equipment. Remove exist. platform, hardwood flooring, wall base, and underlayment. Provide new VCT flooring, wall base, and underlayment. Paint, patch, and repair wall and ceiling from…”
- Alteration, filed Jul 22, 2022, estimated cost $47K, described as “Q470\_Remove all existing lab furniture and equipment and provide new per SCA standard. Construct new partitions. Drill holes through walls and floor for Plumbing work. Repair and replace wall, ceiling, and flooring as required.”
- Alteration, filed Jun 29, 2022, estimated cost $8K, described as “D021292\_Q325 at Q470\_Path of Travel. Provide new ADA Drinking Fountain.”
- Alteration, filed Jun 28, 2022, estimated cost $8K, described as “D21293\_Q470 Path of Travel. Provide a new ADA drinking fountain.”
- Alteration, filed Apr 18, 2022, estimated cost $239K, described as “Q470 -Existing library flooring replacement.”
- Alteration, filed Apr 5, 2022, estimated cost $78K, described as “Convert existing general classroom into a new STEM classroom. PAA: In lieu of submitting a DEP ACP-20/ACP-21 before filing for permit, a DEP Variance (V5) Letter is being submitted.”
- Alteration, filed Mar 23, 2022, estimated cost $52K, described as “Convert existing general classroom into a technology classroom. PAA: In lieu of submitting a DEP ACP-20/ACP-21 before filing for permit, a DEP Variance (V5) Letter is being submitted.”
- Alteration, filed Nov 4, 2021, estimated cost $60K, described as “Replacement of existing gas fired water heater with new, along with required piping modifications, including replacement of recirculation pumps.”

## Property taxes

- Assessment: $29,368,800
- Market value (city estimate): $65,264,000
- Taxable value: $0
- Assessed land: $11,367,000
- Assessed improvements: $18,001,800

## Zoning

R4: floor area ratio 0.38 built, 1.00 allowed by base zoning.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.

## Landmarks

Part of Jamaica High School (Individual Landmark).

## Board and land use applications

- JAMAICA HIGH SCHOOL (City Planning P2009Q0252): Completed, decided Jul 5, 2009. LANDMARK SITE - LP2316

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology