143-06 94th Avenue, Queens
Hotel · built 2022 · Block 9992, Lot 27.
Building permits
- Alteration, filed Oct 8, 2026, estimated cost $28K, described as “Installation of solar panels on roof. No change in use, occupancy, or egress.”
- Alteration, filed Nov 7, 2022, estimated cost $10K, described as “Installation of single 6000 # capacity personnel/material hoist during NB construction. NB filed sep. Hoist shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. Elevator application…”
- Alteration, filed Nov 4, 2022, estimated cost $5K, described as “Installation of temporary supported pipe scaffold per design drawings”
- Alteration, filed Oct 5, 2022, estimated cost $5K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Oct 18, 2021, estimated cost $5K, described as “Herewith to propose temporary 8' high wood construction fence in conjunction with #421784304. No changes in occupancy, use, group or egress under this application.”
- Alteration, filed Mar 2, 2021, estimated cost $3K, described as “This application is filed for 15' wide curb cut in conjunction with NB 440646534.”
- Alteration, filed Feb 23, 2021, estimated cost $913K, described as “This application is filed for structural work related to a new 9 story transient hotel and community facility building. NB #440646534.”
- Alteration, filed Jan 29, 2021, estimated cost $5K, described as “Herewith to propose temporary 8' high wood construction fence. No changes in occupancy, use, group or egress under this application.”
- Alteration, filed Jan 22, 2021, estimated cost $144K, described as “Installation of cooling and heating system in conjunction with new building application# 440646534. No change in use, egress or occupany.”
- Alteration, filed Jan 22, 2021, estimated cost $514K, described as “Installation of sprinkler and standpipe system for entire building in conjunction with new building application# 440646534.no change in use, egress or occupancy.”
- Alteration, filed Jan 22, 2021, estimated cost $427K, described as “Installation of plumbing system in conjunction with new building APPLICATION#440646534. No change in use, egress or occupancy.”
- Alteration, filed Jan 22, 2021, estimated cost $68K, described as “Installation of a temporary standpipe with air pressurized system in conjunction with NB # 440646534 . No change in use, egress, or occupancy under this building.”
- Alteration, filed Oct 29, 2019, estimated cost $5K, described as “Herewith to propose temporary 8' high wood construction fence. No changes in occupancy, use, group or egress under this application.”
Property taxes
- Assessment
- $4,778,100
- 2026–27 tax
- $75,245
- Market value (city estimate)
- $10,618,000
- Taxable value
- $4,370,850
- Assessed land
- $243,450
- Assessed improvements
- $4,534,650
Tax breaks
- ICAP abatement, through Jun 30, 2049, a $398,905 credit this tax year.
Zoning
C6-2A: floor area ratio 4.84 built, 6.02 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Jun 25, 2020: $1,650,000, 8,100 sq ft ($204 per sq ft)
Open-market sales since 2016, from the Department of Finance’s sales files.
Board and land use applications
- Jamaica Neighborhood Plan (City Planning 2023Q0381): Zoning map change, Zoning text change, Urban development action area, Completed, filed Mar 14, 2025, decided Oct 29, 2025. In coordination with its agency partners, DCP is leading a neighborhood study in Jamaica that focuses on areas within and surrounding the Special Downtown Jamaica District. This study seeks to increase the supply of permanently affordable…
In the news
Permits Filed for 143-10 94th Avenue in Jamaica, Queens, New York YIMBY, Nov 18, 2020.