94-24 Guy R Brewer Blvd, Queens
College · built 1982 · Block 10104, Lot 43.
Building permits
- Alteration, filed Nov 5, 2026, estimated cost $650K, described as “Removal /re-installation of existing ceiling tiles to access the removal / replacement of existing fume hoods @ york college. No change in use, egress or occupancy.”
- Alteration, filed Sep 18, 2026, estimated cost $7K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- No Work, filed Aug 20, 2025, described as “University Orientation and Bible Study tent gathering August 28th - September 26th, 2025 Use Of Structure: University Orientation and Bible Study Time: 12:00 PM TO 12:30 PM, 7:30 PM TO 11 PM”
- Alteration, filed Feb 25, 2025, estimated cost $10K, described as “Filing for temporary construction fence. No change in use, egress or occupancy.”
- Alteration, filed Jan 31, 2025, estimated cost $5K, described as “Temporary work platform as per drawings. Work platform shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Nov 19, 2024, estimated cost $45K, described as “Erect two non-illuminated single faced wall-mounted signs as per plans filed herewith”
- Alteration, filed Aug 1, 2024, estimated cost $1.1M, described as “Paving replacement from archer ave entrance, tunnel to york college entrance. York college sign removal & structural work for sign. Replace security fence/gate and installation of lighting fixtures inside of tunnel. No change in egress,…”
- Alteration, filed Jun 28, 2024, estimated cost $40K, described as “Filing for the sidewalk replacement on archer avenue entrance & york college sign and letter removal & erection work as per plans filed herewith. No change in egress, use or occupancy.”
- Alteration, filed Apr 10, 2024, estimated cost $1.4M, described as “Plumbing work consisting of replacing all existing domestic cold water galvanized steel piping w/ copper including replacing water booster pumps & water heaters. Removal & cap of existing chilled drinking water unit. No changes to…”
- Alteration, filed Apr 10, 2024, estimated cost $60K, described as “General construction consisting of renovating ceilings in cellar & 4TH floor, & removal of existing soffits. Existing lighting to remain. No changes to egress, occupancy or use.”
- Alteration, filed Apr 10, 2024, estimated cost $104K, described as “Mech work on cel, bas, & 4TH fl of 5 story building consisting of replace of vav, associated duct work to accommodate replacement of cold piping, & mechanical boiler piping to domes water heater (indirect fired heater). No change to…”
- Alteration, filed Oct 3, 2023, estimated cost $9K, described as “Proposed installation of heavy duty sidewalk shed as per plans. Live load 300 lbs per square feet. Sidewalk shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Jul 14, 2023, estimated cost $8K, described as “Proposed installation of temporary pipe scaffold as per plans. Work shall comply with chapter #33 of the NYC building code. No change in use, occupancy, or egress under this application.”
- Alteration, filed Apr 24, 2023, estimated cost $12K, described as “Propose to install temporary tent structure all as per plans herewith filed. No change in use, egress or occupancy filed under this application.”
- No Work, filed Apr 24, 2023, described as “Bible study tent gathering may 15TH - june 21ST, 2023 use of structure: bible study time:12 pm to 2 pm, 7:30 pm to 11 pm”
- Alteration, filed Jan 10, 2023, estimated cost $45K, described as “Modification to an existing Verizon site on the roof. Replace (9) antennas. Install (3) MDBs & (6) RRHs. Relocate (2) GPS units. Remove (2) cabinets & (9) RRHs and retrofit (1) cabinet in existing equipment shelter on lower roof.”
- Alteration, filed Oct 19, 2022, estimated cost $12.4M, described as “Interior renovation of public toilets and adjoining spaces, including removal and installation of non bearing partitions, fixtures and finishes. No change is proposed to use, occupancy or egress.”
- Alteration, filed Sep 28, 2022, estimated cost $118K, described as “York College AC Bldg, PL repairs on various roof levels & Plaza, in conjunction with DOB Application# 440593831, as per the plans filed including: Remove & install roof drains. Extend & relocate roof vents away from parapet walls. Strom…”
- Alteration, filed Sep 28, 2022, estimated cost $71K, described as “York College AC Bldg, MH repairs on various roof levels & PH, in conjunction with DOB Application# 440593831, as per the plans filed including: Remove, protect, store & reinstall existing penthouse louvers. Remove existing & install 2 new…”
- Alteration, filed Aug 1, 2022, estimated cost $304K, described as “Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 21, 2022, estimated cost $264K, described as “Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 20, 2022, estimated cost $13K, described as “Installation of temporary scaffold stair tower as per drawings. Scaffold stair tower shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 20, 2022, estimated cost $13K, described as “Installation of heavy duty sidewalk shed during bldg alteration, filed sep. Sidewalk shed shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Jul 13, 2022, estimated cost $34K, described as “Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.”
- Alteration, filed Jul 11, 2022, estimated cost $1.2M, described as “Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.”
24 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $38,569,950
- Market value (city estimate)
- $85,711,000
- Taxable value
- $0
- Assessed land
- $6,880,950
- Assessed improvements
- $31,689,000
Zoning
R6: floor area ratio 0.94 built, 2.43 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.