130-02 South Conduit Ave, Queens
Industrial condominium · built 2021 · Block 11884, Lot 7501.
Building permits
- Alteration, filed Mar 5, 2024, estimated cost $189K, described as “Modification of existing sprinkler system including heads, piping and auxilary hose connections as indicated herein. No change to use, egress or occupancy”
- Alteration, filed Jan 22, 2024, estimated cost $600K, described as “Installation of new HVAC systems, including equipment, ductwork, and piping as per plans filed herewith. No change to use, egress or occupancy”
- Alteration, filed Dec 11, 2023, estimated cost $70K, described as “Non structural demolition of commercial space including removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Oct 5, 2023, estimated cost $20K, described as “Removal and installation of non-load bearing partitions as per plans filed herewith (addition of self storage units in cellar).”
- Alteration, filed Sep 21, 2023, estimated cost $1.2M, described as “Interior renovation of a commercial space including removal and installation of non bearing partitions and related finishes as per plans filed herewith. No change to use, egress or occupancy.”
- Alteration, filed Jul 12, 2023, estimated cost $3K, described as “Erect in-direct illuminated double faced accessory business wall sign-d at north elevation facde wall, no change to use, egress or occupation”
- Alteration, filed Jul 12, 2023, estimated cost $33K, described as “Erect direct illuminated accessory business wall sign-c at north elevation facde wall, no change to use, egress or occupation”
- Alteration, filed Jul 12, 2023, estimated cost $25K, described as “Erect in-direct illuminated accessory business wall sign-b at north elevation facde wall, no change to use, egress or occupation”
- Alteration, filed Jul 12, 2023, estimated cost $26K, described as “Erect in-direct illuminated accessory business wall sign-f at east elevation facde wall, no change to use, egress or occupation”
- Alteration, filed Jul 12, 2023, estimated cost $32K, described as “Erect in-direct illuminated accessory business wall sign-a at north elevation facde wall, no change to use, egress or occupation”
- Alteration, filed Jul 12, 2023, estimated cost $8K, described as “Erect in-direct illuminated accessory business wall sign-e at west elevation facde wall, no change to use, egress or occupation”
- Alteration, filed Nov 22, 2022, estimated cost $1K, described as “Install new fuel oil storage tank for generator.”
- Alteration, filed Nov 22, 2022, estimated cost $1K, described as “Refiling of application no. Q00476785 for generator.”
- Alteration, filed Nov 1, 2021, estimated cost $1K, described as “Filing herewith for a Curb cut application (130th Street, CC#7)”
- Alteration, filed Nov 20, 2020, estimated cost $73K, described as “Installation of system scaffold stair tower as per drawings. Stair tower shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 19, 2020, estimated cost $2K, described as “Installation of system scaffold stair tower as per drawings. Scaffold shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Aug 27, 2020, described as “Installation of temporary pipe scaffold as per plans. No change in use, egress or occupancy.”
- Alteration, filed May 11, 2020, estimated cost $1K, described as “Filing herewith for underground plumbing work. Filed in connection with NB# 420664864.”
- Alteration, filed Feb 26, 2020, estimated cost $60K, described as “Installation of heavy duty shed during NB const, filed separately. Shed shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application. Shed legs to be installed in roadway. Dot permits…”
- Alteration, filed Jan 23, 2020, estimated cost $120K, described as “Installation of plywood fence during during new building construction, filed separately. Plywood fence shall comply with chapter #33 of the NYC building code. No change in use, occupancy or egress under this application.”
- Alteration, filed Dec 28, 2019, estimated cost $3K, described as “New curb cut filing associated with DOB BPP No. 421738659”
- Alteration, filed Dec 28, 2019, estimated cost $3K, described as “Application for new curb cut installation under DOB BPP App No. 421738659”
- Alteration, filed Dec 28, 2019, estimated cost $3K, described as “New curb cut filing associated with DOB BPP No. 421738659”
- Alteration, filed Dec 28, 2019, estimated cost $3K, described as “New curb cut filing associated with DOB BPP No. 421738659”
- Alteration, filed Dec 28, 2019, estimated cost $3K, described as “New curb cut filing associated with DOB BPP No. 421738659”
2 more, older permits are in this building’s full list on the map.
Property taxes
- Assessment
- $22,509,000
- 2026–27 tax
- $526,529
- Market value (city estimate)
- $50,020,000
- Taxable value
- $22,509,000
- Assessed land
- $3,502,800
- Assessed improvements
- $19,006,200
- Condo units with their own tax lots
- 2
Zoning
M1-2: floor area ratio 2.78 built, above the 2.00 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
Recent sales
- Aug 31, 2023: $57,100,000, Apt U2
- Mar 15, 2023: $124,000,000, Apt U1
Open-market sales since 2016, from the Department of Finance’s sales files.
In the news
Developers Complete $136M Recapitalization of Terminal Logistics Center at 130-24 South Conduit Avenue in Jamaica, Queens, New York YIMBY, Apr 6, 2023.