# 109-59 Inwood Street, Queens

Public school · built 1950 · Block 11942, Lot 302.

On Umarelli: https://umarelli.org/nyc/4119420302/145-14-glassboro-avenue

More construction in South Jamaica: https://umarelli.org/nyc/queens/south-jamaica.md

## Building permits

- New Building — Non-residential, filed Dec 27, 2021, 4 stories
- Alteration, filed Mar 2, 2026, estimated cost $145K, described as “Removal of existing pavement, stairs and lawn as shown on drawings. Addition of asphalt slope walk, modular block wall, concrete walls, planters, subway type grating, concrete stairs, and resin bound aggregate paving.”
- Alteration, filed Sep 4, 2025, estimated cost $500K, described as “Electric boilers installation”
- Alteration, filed Sep 3, 2025, estimated cost $17.9M, described as “Electrification project of existing building PS 160 Q”
- Alteration, filed Apr 16, 2025, estimated cost $100K, described as “Installation of solar PV system on the exisitng rooftop. No changes to the egress, use or occupancy.”
- Alteration, filed Aug 23, 2024, estimated cost $1.2M, described as “ADA upgrade: public assembly spaces and select bathrooms as well as room conversions”
- Alteration, filed Nov 9, 2023, estimated cost $14K, described as “LLW#116471: temporary pipe scaffold inside elevator shaft. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application.”
- Alteration, filed Oct 17, 2023, estimated cost $10K, described as “Debris chute in conjunction with 4 story school addition.”
- Alteration, filed Oct 17, 2023, estimated cost $15K, described as “Install 15,000 gallon temporary fuel oil storage tank in secondary containment to provide heat to the school. Install temporary supply and return lines from the top of the tank to the existing pump set inside the cellar. No change in use,…”
- Alteration, filed Feb 17, 2023, estimated cost $50K, described as “Proposed underpinning of new building addition design.”
- Alteration, filed Jan 25, 2023, estimated cost $10K, described as “Installation of sidewalk shed for public protection during construction work.”
- Alteration, filed Nov 30, 2022, estimated cost $1.0M, described as “P.s. 160-q: soe (utilities) and soe detention tanks for a new 4-story school building.”
- Alteration, filed Oct 18, 2022, estimated cost $1.0M, described as “P.s. 160-q proposed support of excavation for a new 4-story school building.”
- Alteration, filed Sep 12, 2022, estimated cost $25K, described as “P.s. 160-q: proposed temporary construction fence for a new 4-story school addition. Temporary fence application filed in conjunction with new building application and all related applications.”
- Alteration, filed Mar 22, 2022, estimated cost $3.3M, described as “Plumbing installation for new building at PS 160 Q”
- Alteration, filed Feb 3, 2022, estimated cost $15K, described as “Ps 160 q-installation of support of excavation as shown on drawings. No change in use egress oroccupancy. We shall comply with chapter 33 of 2014 b.c. Job filed in conjunction with DOB# 421902506”
- Alteration, filed Feb 2, 2022, estimated cost $5K, described as “Ps 160 q, we shall install 300 lf of construction fence, as shown on drawings. No change in use egress oroccupancy. We shall comply with chapter 33 of 2014 b.c. Job filed in conjunction with DOB# 421902506”
- Alteration, filed Jan 27, 2022, estimated cost $883K, described as “Manual wet combination sprinkler and standpipe system for new building at PS 160 Q”
- Alteration, filed Jan 25, 2022, estimated cost $750K, described as “Removal of window and part of exterior wall and install new doors on all floors for connection to the new building”
- Alteration, filed Jan 24, 2022, estimated cost $6K, described as “The work consists of a relocation of an existing sanitation curb cut approximately 180' east along Glassboro Avenue. The proposed curb cut must be relocated due to the construction of a new building addition in the location of the existing…”
- No Work, filed Jan 20, 2022

## Property taxes

- Assessment: $10,299,150
- Market value (city estimate): $22,887,000
- Taxable value: $0
- Assessed land: $959,850
- Assessed improvements: $9,339,300

## Zoning

R4: floor area ratio 1.82 built, above the 1.00 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard.