135TH Avenue, Queens
Hotel · built 2024 · Block 12099, Lot 36.
Building permits
- New Building — Hotel, filed Apr 2, 2021, estimated cost $1.0M, 260 hotel rooms, 14 stories, described as “Hereby filing for new 14 story r-1 hotel building”
- Alteration, filed Mar 4, 2026, estimated cost $43K, described as “Installation of 6.16 kw solar energy system on roof. No change of occupancy, use or egress.”
- Alteration, filed Dec 16, 2024, estimated cost $20K, described as “Installation of a temporary personnel/material hoist complex as per plans. No change in use, egress or occupancy. Hoist complex installed in accordance with with 2022 NYC building code,chapter 33.”
- Alteration, filed Nov 13, 2024, estimated cost $5K, described as “Installation of a heavy duty sidewalk shed and medium duty pipe scaffold as per drawings during new building work. No change in use, egress and occupancy. Sidewalk shed and pipe scaffold to comply with chapter 33 of the NYC building code…”
- Alteration, filed Sep 17, 2024, estimated cost $1K, described as “Hereby filing for a temporary curb cut during construction. This applicatication is filed in conjunction with NB application Q00487705-I1. No change to use egress or occupancy.”
- Alteration, filed Jul 26, 2024, estimated cost $510K, described as “Installation of 102.4 kw solar energy system on roof. no change of occupancy, use or egress.”
- Alteration, filed Jul 2, 2024, estimated cost $1K, described as “Hereby filing for a new sprinkler & standpipe system in conjunction with NB#Q00487705.”
- Alteration, filed Apr 3, 2024, estimated cost $1K, described as “Hereby filing for new temporary standpipe alarm system as per local law 63&64 of 2009. This application is filed in conjunction with NB application# Q00487705-I1”
- Alteration, filed Apr 2, 2024, described as “Installation of suspended scaffold during facade inspection/repair.”
- Alteration, filed Mar 28, 2024, estimated cost $10K, described as “Proposed temporary construction fence outside the property line but within 3 feet of the property line”
- Alteration, filed Feb 23, 2024, estimated cost $30K, described as “Hereby filing for plumbing house drain relocation work. No change to use egress or occupancy”
- Alteration, filed Jul 28, 2021, estimated cost $1K, described as “Hereby filing for related structural work in conjuction with NB# Q00487705-I1”
- Alteration, filed Jul 7, 2021, estimated cost $1K, described as “Hereby filing for related plumbing work for new building application #QOO487705-I1”
- Alteration, filed May 28, 2021, estimated cost $1K, described as “Hereby filing for related mechanical work for new building application# Q000487705-I1”
Property taxes
- Assessment
- $6,046,650
- 2026–27 tax
- $640,817
- Market value (city estimate)
- $13,437,000
- Taxable value
- $5,907,239
- Assessed land
- $473,400
- Assessed improvements
- $5,573,250
Zoning
C4-2: floor area ratio 7.07 built, above the 3.40 base zoning allows, which bonuses, transfers or older rules can permit.
Flood zone
Current FEMA flood map: zone X, minimal flood hazard.
In the news
JFK Airport Hotel To Be Converted Into Affordable Housing at 144-02 135th Avenue in South Jamaica, Queens, New York YIMBY, Dec 19, 2023.