156-01 Cross Bay Boulevard, Queens
Commercial · built 1981 · Block 14148, Lot 1.
Some of the city’s records for this lot were still loading when this page was made; it refreshes within minutes.
Building permits
- Alteration, filed Jul 21, 2025, estimated cost $12K, described as “Modification of an existing sprinkler system on the first floor at stop and shop supermarket as per plans submitted herewith, no change in use, egress or occupancy group.”
- Alteration, filed May 13, 2025, estimated cost $1K, described as “Non-illuminated non-advertising accessory wall sign - citibank. No change of use, egress or occupancy.”
- Alteration, filed May 13, 2025, estimated cost $850, described as “Illuminated non-advertising accessory sign on wall structure permitted under application # Q01205192- in property lines - citibank. No change of use, egress or occupancy.”
- Alteration, filed May 13, 2025, estimated cost $850, described as “Illuminated non-advertising accessory sign on wall structure permitted under application # Q01205192- in property lines - citibank. No change of use, egress or occupancy.”
- Alteration, filed May 13, 2025, estimated cost $850, described as “Illuminated non-advertising accessory sign on wall structure permitted under application # Q01205192- in property lines - citibank. No change of use, egress or occupancy.”
- Alteration, filed May 13, 2025, estimated cost $5K, described as “Wall structure fascia sign band for accessory signage. No change of use, egress or occupancy.”
- Alteration, filed Jan 3, 2025, estimated cost $1K, described as “Stop & Shop: Interior Alteration to construct rated closet to enclose existing Automatic Transfer Switch.”
- Alteration, filed Mar 22, 2024, estimated cost $32K, described as “Interior modifications within existing Stop & Shop for installation of Non-Bearing partitions, new self-contained refrigeration/freezer cases and shelving. No change in use,egress,occupancy,square footage and/or site related provisions…”
- Alteration, filed Nov 13, 2023, estimated cost $550, described as “Replace exterior illuminated ground sign. Existing pole structure to remain. (flagstar)”
- Alteration, filed Nov 13, 2023, estimated cost $2K, described as “Install exterior non-illuminated wall sign (flagstar)”
- Alteration, filed Nov 13, 2023, estimated cost $2K, described as “Install exterior non-illuminated wall sign (flagstar)”
- Alteration, filed Aug 10, 2022, estimated cost $15K, described as “Erect accessory business wall sign for stop & shop, no change in use, egress or occupancy.”
- Alteration, filed Aug 8, 2022, estimated cost $10K, described as “Erect accessory business wall sign for stop & shop, no change in use, egress or occupancy.”
- Alteration, filed Aug 8, 2022, estimated cost $15K, described as “Erect accessory business wall sign for stop & shop, no change in use, egress or occupancy.”
- Alteration, filed Aug 8, 2022, estimated cost $2K, described as “Erect accessory business wall sign for stop & shop, no change in use, egress or occupancy.”
- Alteration, filed Aug 8, 2022, estimated cost $15K, described as “Erect accessory business wall sign for stop & shop, no change in use, egress or occupancy.”
- Alteration, filed Aug 8, 2022, estimated cost $2K, described as “Erect accessory business wall sign for stop & shop, no change in use, egress or occupancy.”
- Alteration, filed Jul 14, 2022, estimated cost $163K, described as “Stop & Shop; Water Supply, sanitary, and vent pipes for new sinks and drains. New Case drains and underground piping for new refrigerated cases.”
- Alteration, filed Jul 14, 2022, estimated cost $15K, described as “Stop & Shop; New HVAC unit. New duct and gooseneck vent. Hood and ductwork in the existing kitchen for commercial cooking.”
- Alteration, filed Jul 13, 2022, estimated cost $711K, described as “Stop & Shop; Removal of non-load bearing partitions and ceilings. Installation of non-load bearing partitions, and ceilings. Installation of new refrigerated cases and shelving. Trenching and concrete infill for new underground piping.”
- Alteration, filed Jul 12, 2021, estimated cost $20K, described as “CBES- Stop& Shop; Reconfiguration of front end equipment to provide space for on line pick up orders. Installation of new self-contained refrigerated cases. No change in use, egress, occupancy, zoning computation and/or square footage.”
Property taxes
- Assessment
- $3,457,350
- 2026–27 Tax
- $370,797
- Market value (city estimate)
- $7,683,000
- Taxable value
- $3,418,110
- Assessed land
- $2,268,000
- Assessed improvements
- $1,189,350
Zoning
R3-2: floor area ratio 0.51 built, 0.75 allowed by base zoning.
Flood zone
Current FEMA flood map: zone X, moderate risk: a 0.2% chance of flooding each year. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NAVD88).