# 98-01 99th Street, Queens

Public School · built 1963 · Block 14168, Lot 16.

On Umarelli: https://umarelli.org/nyc/4141680016/98-01-99-street

More construction in Howard Beach: https://umarelli.org/nyc/queens/howard-beach.md

Every lot on block 14168: https://umarelli.org/nyc/queens/14168.md

## Building permits

- Alteration, filed Oct 27, 2026, estimated cost $63K, described as “Installation of new drinking fountains and furring wall”
- Alteration, filed Aug 18, 2026, estimated cost $356K, described as “Division of Classroom 113 into two half size classrooms.”
- Alteration, filed Apr 23, 2026, estimated cost $10K, described as “Installation of pipe scaffold for ps 146Q at 98-01 159 avenue, queens in conjunction with alt# Q01195458 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Apr 23, 2026, estimated cost $10K, described as “Installation of temporary construction fence for ps 146Q at 98-01 159 avenue, queens in conjunction with alt# Q01195458 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Apr 23, 2026, estimated cost $10K, described as “Installation of new sidewalk shed for ps 146Q at 98-01 159 avenue, queens in conjunction with alt# Q01195458 as indicated on plans. There will be no change in the use, egress, or occupancy under this application.”
- Alteration, filed Aug 14, 2025, estimated cost $10K, described as “Construction fence located around front yard playground for SCA job # LLW136409 & 137194.”
- Alteration, filed Mar 18, 2025, estimated cost $3.0M, described as “Exterior masonry replacement including: Brick masonry and Limestone, replacement of window sills and repair / replacement of cornice stones. Parapet fencing repair. Interior repair of plaster walls and ceiling. Replacement of window…”
- Alteration, filed Oct 10, 2024, estimated cost $285K, described as “Remove asphalt pavement, concrete stairs and handrails, play structures and safety tiles, iron fence and gates. Install asphalt pavement, concrete pavement, concrete ramps and handrails, play equipment and safety tiles, benches, and…”
- Alteration, filed Oct 16, 2023, estimated cost $15K, described as “Submitted on behalf of contractor for the installation of emergency temporary construction equipment (fence) 600 lf, in conjunction with llw# 135546, no change in use, occupancy or egress.”
- Alteration, filed Oct 16, 2023, estimated cost $100K, described as “Submitted on behalf of contractor for the installation of emergency temporary construction equipment (shed) 700 lf, in conjunction with llw# 135546, no change in use, occupancy or egress.”

## Property taxes

- Assessment: $8,527,950
- Market value (city estimate): $18,951,000
- Taxable value: $0
- Assessed land: $951,750
- Assessed improvements: $7,576,200

## Zoning

R3X: floor area ratio 0.91 built, above the 0.75 base zoning allows, which bonuses, transfers or older rules can permit.

## Flood zone

Current FEMA flood map: zone X, minimal flood hazard. FEMA’s preliminary map: zone AE, high risk: a 1% chance of flooding each year, base flood elevation 10 ft (NAVD88).

## Board and land use applications

- Resilient Neighborhoods: Old Howard Beach (City Planning 2018Q0377): Zoning map change, Completed, decided Jun 2, 2021. The NYC Department of City Planning (DCP) proposes a Zoning Map Amendment from R3-1 and R3-2 districts to an R3X district and from an R3-2 to an R3-1 district along Huron Street to limit future development to reduce flood risk and…

From New York City and Jersey City public records, refreshed within a day of each release. Sources: https://umarelli.org/sources. Methodology and corrections: https://umarelli.org/methodology